BIM Came in Handy for Modera Davis Construction, USA

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

3d model creation of Modera Davis – a mixed used construction in Portland, Oregon, USA was implemented in BIM. A team of 6 engineers of Pinnacle Infotech provided shop drawings for both vertical and horizontal clients using color codes of concrete elements at various elevations. Constructability Review was shared to client by raising RFIs & RFCs, incorporating subsequent solution in the design.

Read the Case Study to explore how Pinnacle delivered models & lift drawings, undergoing thorough checking for constructability issues.pdf-icon

 

 

©2023 pinnacleinfotech.com | Privacy Policy | Disclaimer