Checked the Aesthetics of Light Alignment as well as Conduit Elevation, Material, Size & Position
Used conduit down symbol in wall for connecting inscreed conduit to high level conduit.
Ensured that all services were correctly modeled in Revit with clash checks and coordination among services & structure.
Ensured all services inside the vertical shafts.
Maintained enough clearance from all services running below the beams.
Checked the levels of false ceiling from Architectural RCP drawings for all areas and ensure all services are located above.
Checked the space between bottom of beams and false ceiling for services – in case of inadequate space, beam penetrations provided for the same, avoiding extreme top and bottom of the beams.