Dubai Metro Route 2020

Location: Dubai, UAE
Year: 2020
Pinnacle executed the 3D Modeling, Video Presentation and 4D simulation of Dubai Metro Urban Rail System, which consists of a total length of 75 kilometers. The Dubai Metro Project is the world’s longest driverless rail system including the construction of viaducts, tunnels, 45 stations, depots and car parks. The Dubai Metro network is a fully automated and driverless system running on two lines, the Red Line and the Green Line, the majority of which are elevated. Both lines consist of underground sections where they run through Dubai’s Central Business District (CBD) and the lines cross the Creek to link the south and north banks.

Key Project Details

Project Area (sqft):484,000 sq ft
Contractor(s):Obayashi
Owner:Roads and Transport Authority
Related Verticals:Architects, Structural Engineering

Value Added

  1. 3D modeling of the architectural and structural element of the expo station and other elevated stations
  2. A video presentation of route 2020 showing the construction methodology
  3. 4D simulation of the expo station, ending with a walk-through showing the proposed condition.

Key Project Details

Project Area:484,000 sq ft
Contractor(s):Obayashi
Owner:Roads and Transport Authority
Related Verticals:Architects, Structural Engineering

We'd love to hear about your next project.