Hilton Waterfront Beach Resort

Location: California, USA
Pinnacle is responsible for creating the 3D Models of Hilton Waterfront Beach Resort – a 10 Storey Hotel building consisting of 10 floors (basement to 9th floor, including parking, equipment room, 2 mechanical rooms and tower roof). The purpose of creating the 3D Models for new construction of hotel and beach resort is for resolving clashes and preparation of BOM (Bill of Materials) for pipes.

Key Project Details

Architect:WATG
Contractor(s):Iron Mechanical Inc.
Owner:Waterfront Hotels, C, LLC

Value Added

  1. Rerouted pipes, ducts & piping Layouts to reduce fittings and cost
  2. Provided RFIs with appropriate snap to understand the issues with proposed solution like design conflict, fixture location mismatch, pipe continuation missing or mismatch
  3. Coordination with other Services like architecture, structure electrical, Fire Protection
  4. Re-routed the pipes, ducts & pipings for coordination with architecture, structure & other MEP services
  5. Changed rectangular duct to round duct with the help of duct calculator 6. Raised 5 RFIs & resolved 1000+ clashes including 200 critical clashes in the BIM Model (for example clash between Mechanical Pipe & Plumbing Pipe, Clash between pipes and structure)

Key Project Details

Architect:WATG
Engineer:JBA Consulting Engineers
Contractor(s):Iron Mechanical Inc.
Owner:Waterfront Hotels, C, LLC

We'd love to hear about your next project.

©2023 pinnacleinfotech.com | Privacy Policy | Disclaimer