info@pinnacleinfotech.com     |

JW Marriott Nashville

Location: Nashville, Tennessee
Pinnacle created the 3D BIM Models of JW Marriott Hotel consisting of 1 Building with 34 Floors (3 Zones) for fabrication at LOD 400 to produce shop drawings for construction and to meet various objectives of the project viz. 3D coordination, clash mitigation and quantity take-offs.

Key Project Details

Architect:Smallwood, Reynolds, Stewart, Stewart & Associates, Inc.
Contractor(s):BMCC (Bernhard MCC, LLC)

Value Added

We raised RFIs pertaining to:

  1. Missing Ceiling Height & Mismatch of Marked Ceiling Height with Plan & Section Detail  (ceiling plan showed 21′-0″ but the section showed 21′-9″).
  2. The elevation of the topping slab was indicated by a cross hatched area. However, we did not find any specific area for the elevations.
  3. The elevation of the topping slab was lower than the structural slab in the elevation chart.

We resolved clashes arising out of constructability issues related to duct vs. plumbing, plumbing vs. MEP and other trade coordination.

We rerouted ducts and pipes for providing cost-effective solutions to our client.

We communicated with the client through Webex, Newforma and email. Single point of contact was used for this project, facilitating project communication between India and US, which helped us to maintain standards, quality, specifications and templates.

Moreover, using Newforma facilitated Centralized File Sharing & Seamless Workflow (Global Collaboration), RFI (Creation), Document Control, Transmittals Tracking (Time Saving), Access Information & Enhanced Search helping client to filter and download current data, Ease of operation due to Newforma PDF Binder Tool and Risk Mitigation & Security of data.

Key Project Details

Architect:Smallwood, Reynolds, Stewart, Stewart & Associates, Inc.
Engineer:MEP Thompson Company, Inc.
Contractor(s):BMCC (Bernhard MCC, LLC)

We'd love to hear about your next project.

©2022 pinnacleinfotech.com | Privacy Policy