Pinnacle produced detailed Lift Drawings, within a tight deadline. The Lift Drawings are extremely critical as they form the basis for concrete pours.
The accuracy and turn-around time are extremely critical as the contractor’s material and labor cost would be adversely affected in case of delay or error.
Pinnacle produced 100 – 120 Lift Drawings every month to meet Baker’s aggressive pouring schedule while ensuring error-free construction. Every minute detail like embeds, water-stops, cut-outs are incorporated in every Lift Drawing to prevent issues later when MEP subs will come into the fold.