info@pinnaclecad.com     |     

Moberly Sports Center

Location: London, UK
Pinnacle created the Clash Detection and Clash Report generation of Residential & Leisure Space for Moberly Sports Center Building (including Basement Level, Ground Floor, Mezzanine, Transfer Level, First Floor, Second Floor, Third Floor, Fourth Floor & Fifth Floor). The BIM model was divided into separate levels focusing on particular building location for efficient working and coordination among various trades. The breakups were necessary to reduce file size so that the files can be smoothly handled and delivered avoiding technical glitches.

Key Project Details

Contractor(s):Willmott Dixon Construction

Value Added

We used a checklist while modeling and reviewed the latest documents & markups. We also reviewed interdisciplinary coordination, floor to floor alignment and continuation to other areas.

Furthermore, we conducted aesthetic check, constructability review and value engineering. 

Our coordinated BIM models allowed our client to check possible interference among building systems, visualizing the entire building system before construction, leading to better project planning, eliminating rework during the construction phase, and saving time and money.

We conducted daily status meetings, team meetings, client head review meetings & CEO review meetings. Single point of contact was used for this project, facilitating project communication between India and the UK, which helped us to maintain standards, quality, specifications and templates.

Key Project Details

Contractor(s):Willmott Dixon Construction

We'd love to hear about your next project.

©2021 pinnaclecad.com | Privacy Policy