Vertical hangers were placed 6′-0″ as per USA Eastern standards. However, Pinnacle found some discrepancies with architectural & structural model & raised RFI for the same. The RFI standard for this project was changed after reviewing and the shop drawings were revised accordingly.
Pipe bracing clashing with purlin was revised in model & shop drawing as per raised RFI.