Pinnacle executed the 3D BIM model of Orlando City Soccer Stadium for USA Eastern Corporation to facilitate workshop fabrication, prepare construction shop drawing and meet various project objectives including 3D Coordination, Clash Mitigation, Quantity Take-off & Visualization.

Key Project Details

Architect:Populous
Owner:Bartonmalow
Related Verticals:Architects, Structural Engineering

Value Added

Vertical hangers were placed 6′-0″ as per USA Eastern standards. However, Pinnacle found some discrepancies with architectural & structural model & raised RFI for the same. The RFI standard for this project was changed after reviewing and the shop drawings were revised accordingly.

Pipe bracing clashing with purlin was revised in model & shop drawing as per raised RFI.

Key Project Details

Architect:Populous
Engineer:Walter P. Moore; Eastern Corporation
Owner:Bartonmalow
Related Verticals:Architects, Structural Engineering

We'd love to hear about your next project.

©2023 pinnacleinfotech.com | Privacy Policy | Disclaimer