Home » P&G Building K
We generated Fabrication drawings from the BIM Model for accurate on-site and off-site prefabrication.
The segmented spool drawings and a spool map with segment locations were generated as per the pre-fabricating standards and preference of our sub-contractor. Pre-fabrication helped our client to improve quality, handle materials and reduce construction cost.
Portfolio
About
Resources
News + Insights
Please share your location to continue.
Check our help guide for more info.