Pinnacle created the 3D Model of USH – Animation Studio Store Building consisting of 3 floors and roof for Site, 1st, 2nd and Roof. The purpose of the project was coordination of electrical services (above ceiling) with other MPFP trades and shop drawing creation. The Site Utility Models included underground storm drain, sewer, gas, grease, methane, electrical conduits, fire sprinkler and underground structural concrete footings for coordinating underground utility.

Key Project Details

Architect:Behr Browers
Contractor(s):Swinerton Builders, Dynalectric
Owner:Hollywood studio
Related Verticals:Electric Contractors

Scope of Work

We provided MEPF Coordination models divided into five (5) for manageable coordination of mechanical, electrical, plumbing and fire protection services.

We checked the conduit missing, co-ordination, conduit position & clash issues as well aesthetic issues (overlapping with conduit, missing size, annotation & overlapping, dimensioning & overlapping problem).

Our virtual project construction in BIM facilitated independent review of construction plan, identifying drawing discrepancies and constructability issues during preconstruction stage. Our team generated RFI’s to identify constructability and operational issues related to missing information, input inconsistencies and accessibility issues

Key Project Details

Architect:Behr Browers
Engineer:S&K Engineers
Contractor(s):Swinerton Builders, Dynalectric
Owner:Hollywood studio
Related Verticals:Electric Contractors

We'd love to hear about your next project.

©2022 pinnacleinfotech.com | Privacy Policy