Pinnacle is responsible for creating the 3D BIM Models of the two buildings (Office & Garage), consisting of five floors in the office and four floors in the garage.
Missing Pipe Layout In Plumbing Floor Plan in Food Service Equipment Plan with regards to 1st Floor Plumbing Drawing and Schematic and requested Pipe Layout from the client to Understand Pipe Connection and Continuation
Mismatch between Fixture Schedule and Riser Diagram
Vertical Carrier not shown in submittal
Plumbing Pipes Penetrating Big Beam under 4th Floor Slab and several others. We have resolved more than 1200 clashes and added 200+ sleeves in both the office & garage buildings for this project.