In recent years, Building Information Modeling (BIM) has significantly transformed the way digital construction is practiced and applied in infrastructure projects. Right from planning, visualization, design, implementation, to management and expansion, every aspect of infrastructure development is simplified and optimized through BIM implementation and project management. In this act of value innovation and process optimization in infrastructure projects, road construction is one of the most imperative segments which is also elemental to public infrastructure policies. Due to its far-reaching significance in public infrastructure development, it has been cohesively addressed and catered to by BIM and engineering design technology.
BIM for road construction involves full-framework implementation of design plans and visual details aligned with the project data into building strategies, processes, and execution maps for road infrastructure development. It involves all critical design and functional aspects of the construction process throughout the lifecycle of the project. BIM for road infrastructure projects involve domain experts like civil engineers, structural engineers, contractors, and other facilitators working collaboratively aiming for optimum results.
BIM for road infrastructure largely aims at precise planning enabling built quality, safety, and sustainability of the project through detailed visual modeling and integrated management. BIM used for construction of road projects allows project managers and service professionals to align and route different operations and resources through a consolidated road infrastructure plan to ensure enhanced value compliance, cost-efficiency, and timely execution.
In a recent survey on a construction forum, 75% of road infrastructure contractors reported stronger collaboration and teamwork by implementing BIM within their systems. This led to fluid communication and seamless compliance amongst teams which resulted in better resource alignment and enhanced turnaround rates. This extensively benefited geographically dispersed teams or contractors working on complex and large-scale road infrastructure projects.
As depicted by a report by the Federal Highway Administration, BIM allows teams to achieve process automation at scale resulting in higher cost efficiencies. BIM workflows allow project members to navigate through visual details and achieve increased design efficiency and higher turnarounds reducing errors and deviations by around 40%, evading chances of major process halts or failures.
Further adding to these facets of benefits offered by BIM in road construction, University of Illinois states that adoption of BIM-led practices in the system can contribute to about 20% of cost savings in facility management operations in an infrastructure project. As per another study, American Society of Civil Engineers came up with data-backed reports that suggested a decrease of 40% in asset lifecycle costs through BIM implementation.
Also, as depicted by real-life examples, BIM-based processes allow teams to seamlessly collaborate, leveraging advanced technological solutions and leading-edge design communication frameworks. BIM tools and technology platforms offer enhanced visualization capabilities for project members to easily identify potential conflicts and resolve clashes accordingly. The use of these tools contributed to reduction of public objections by 25%. These have also decreased the procedural lags and disputes by 32%, as depicted by sample surveys conducted across project types and service segments.
A similar study conducted by The Royal Institution of Chartered Surveyors (RICS), indicated a 30% fall in design errors in the construction phase with BIM-led processes. This not just leads to better resource alignment and higher functional accuracy within the system but also prevents costly reworks and ensures timely submissions and faster turnarounds across the line of action.
Above these factors, one of the key benefits offered by BIM in road construction projects is precise cost estimations. With the help of digital models with dynamic construction data and resource details, Building Information Modeling helps in identifying the estimated cost involved across project phases, leading to more control with cost planning and budgeting. The resulting accuracy in cost estimation and precision in calculations lead to significant reduction in resource and material cost.
Mentioned below are the key practices and applications involved in BIM projects for road infrastructure development:
With BIM, construction teams are able to realistically visualize road plan and route design. BIM allows project professionals to extensively draw a real-life infrastructure model and do traffic simulation analysis, integrating the design layouts with geospatial data, ensuring seamless navigation, safe movements, and coordinated route plan.
BIM promotes team collaboration and communication allowing project stakeholders and professionals to seamlessly connect across departmental functions and operational phases. It allows different project members to share, access, and update information simultaneously and diversely across construction data points and action trajectories. BIM enables collaborative workflows that shift isolated practices to unified processes, promoting shared value and functional synergy across the system.
BIM software and tools allow project management professionals to easily organize and navigate through data to make value-critical decisions. With the help of BIM-based construction processes, project professionals get to precisely handle, structure, process, share, and store data throughout the phases of project execution, facilitating better data management and interoperability at scale.
BIM models allow project teams to clearly visualize the road infrastructure and have more control over deciding on phase-wise deployment plans to cohesively align with different construction project applications and departmental processes. With the procedural clarity established by visual and simulation inputs in road construction planning, project teams are able to reduce the chances of errors and deviations to deliver accurate results.
BIM is leveraged by project engineers and managers as a tool to detect clashes between different road construction trades and disciplines. This is an efficient way to ensure there are no existing or potential conflicts in the process. BIM in road construction also allows project teams to effectively conduct constructability analysis to assess feasibility, identify risk, and take corrective action and resolve issues.
The road infrastructure sector has a heavy reliance on standard design protocol for safety. In the modern construction scenario project professionals are using BIM platforms to implement safety compliance across project lifecycle. By utilizing BIM-integrated safety management software project managers are able to streamline safety processes. They are able to do this while identifying high-risk areas and potential threats in the system and ways to mitigate those, optimizing PPE allocation and ensuring regulatory compliance.
The construction industry is increasingly adopting advanced capabilities of BIM to automate processes that help with estimating costs and schedules in the long-duration and multi-phase projects. With the help of BIM for large infrastructure solutions project managers can access object-based intelligent data models that help with cost projections and schedule planning across operational milestones and project phases. This helps the team manage project budget and timelines most efficiently.
BIM allows project teams working on large-scale road infrastructure projects like ring roads and highways to access a complete project management framework to efficiently establish information network, maintain road infrastructure, and ensure timely repairs and upgrades. BIM provides a holistic view of the road plan and structural details replicating the actual infrastructure as an intuitive data-driven digital blueprint that aids in optimizing lifecycle asset management for road construction projects.
BIM-based projects with digital twins allow project managers to get a real-time all-encompassing view of construction workflows and assets. This allows the maintenance team to keep a thorough check on any functional anomalies and procedural gaps and timely predict and fix any errors and deviations to effectively maintain construction systems. This has a significant role to play in avoiding costly breakdowns and uncertain stoppages throughout the project lifecycle.
Through BIM project professionals can integrate geotechnical studies into the construction design process. With detailed geotechnical data, project teams are able to analyze natural surroundings to depict soil conditions, water levels, risk of natural calamity, and other environmental details. This allows project planners and engineers to combine physical and functional characteristics of the infrastructure with different geotechnical factors and ensure stable and sustainable design for the project.
Here are some of the illustrative civil infrastructure projects including the globally renowned road and highway design applications from across the globe that significantly depict the role and impact of BIM in road construction.
Doha Expressway is a large network of roads connecting the city of Doha across ends. It is considered the heartline of road commutation, forming a seamless express connectivity through the mainland and adjoining highway routes of the city. BIM provided a detailed blueprint of the entire project map and its components in an elaborative and precise 3D model.
BIM also allowed the project management team to get a broader picture of the road network for effective construction management and cost estimation. This led to better decision-making and having a stronger control over construction budget and timelines of the project.
Queensferry Crossing is a prominent road bridge network built in Scotland, United Kingdom, which connects Edinburgh and Fife. The 2.7 kilometres road infrastructure project began in 2011 and ended in 2017, providing a way for a huge number of commuters to flow quickly across the regions avoiding long conventional routes. The project team used BIM to put in place a more efficient system for process execution and structural reinforcement.
With BIM being implemented within the system, the project team was able to improve phase-to-phase coordination and process accuracy through automation-led design practices. BIM-integrated workflows allowed different service providers and stakeholders to work together and visualize construction throughout the line of action with great efficiency and accuracy. This resulted in better construction sequencing, workflow management, and process compliance.
Yuan Chen Expressway is an expansive highway infrastructure in the Hunan Province of China. The massive road infrastructure connects Yuanling County and Chenxi County in Huaihua City of the region. Building the expressway needed a strong strategic plan that was technologically aligned for sharing advanced asset data and workflow information.
The process combined cutting-edge technologies like GIS (Geographic Information Systems) and IoT (Internet of Things) with BIM to help teams plan, manage, and execute the project achieving optimum technological value. This helped various stakeholders to collaboratively work together toward the project goals and achieve enhanced construction efficiency in the process.
The North-South Corridor Project (NSC) in Singapore started as North-South Expressway Project in 2018 is a 21.5 kilometre road infrastructure developed by Singapore Land Transport Authority. This project has a huge significance in bringing down traffic congestion in the area.
BIM played a pivotal role in optimizing functions across the construction process. BIM as a project visualization tool digitally transformed the entire process right from initial planning to design and construction. It included precise clash-coordinating workflows, ensured accuracy in quality estimation, and produced sustainable design plans. Implementation of BIM enhanced team collaboration and standardized approach in compliance management which resulted in streamlined practices across construction phases.
Building Information Modeling introduces immersive digital possibilities and technological value to the process of road infrastructure development. Through BIM traditional processes are gradually taking a progressive shift toward hyper-automated and collaborative practices. BIM is proving transformative for stakeholders across the functional system, allowing them to approach visual designing, workflow planning, and information management, acting on integrated information and objective details to cohesively simulate and depict construction processes and final outcomes. As we look into the future of BIM processes for road infrastructure, it shows all signs to grow as a cohesive tool to ascertain operational accuracy, streamline resources, collaborate functions, and automate processes through evolved data models, affirmative action plans, coordinated task sequences, and advanced technology integration.
BIM for infrastructure allows construction teams to comprehensively work on digital modeling of road and highway projects, replacing traditional paper-based processes. With this, they are able to visualize designs better, precisely perform clash detection, and seamlessly coordinate across trades and functions throughout the project lifecycle.
BIM models store asset data and construction details and work as single source of truth for project functionaries. With this centralized system, information exchange improves, which in turn leads to reduced rework, and helps in maintaining updated digital records throughout the process.
By integrating digital processes, data models, and cloud-based tools, BIM-based processes elevate and transform infrastructure projects digitally to make it deliver enhanced value and optimum output over traditional methods of construction.
BIM supports asset management systems by providing accurate asset data, structural elements, and maintenance schedules. This helps facility managers manage services more efficiently and extend the life of transportation assets.
BIM as a construction planning and automation tool promotes a collaborative work environment for project associates and professionals by facilitating real-time information sharing between them. This shift in work practices allow project owners to see improved communication and coordination across construction phases and timelines.
BIM models have a crucial role to play in enhancing energy efficiency and traffic flow in highway infrastructure projects. With BIM implemented into the design and production process, project teams are able to simulate various scenarios and can easily and accurately assess performance. This is where engineers are allowed to explore different layouts, experiment with different lighting options, and work around various traffic patterns and this ultimately leads to better energy use and smoother traffic flow.
There are a few common challenges faced by teams working on highway construction projects including lack of skilled professionals, resistance to change, and inability to adapt to existing workflows. To evade or overcome these it requires to take up targeted training, early stakeholder engagement, and selecting BIM tools compatible with infrastructure project needs.
BIM really enhances how road construction projects are delivered and managed. It makes the design and construction processes much smoother by allowing teams to collaborate in real-time, keeping data aligned, and helping everyone make better decisions. This approach cuts down on mistakes, makes the best use of resources, and speeds up project completion.
BIM allows seamless integration with an agency's information systems, aligning asset information and project data across platforms. This unified approach enhances data transparency and supports better public infrastructure planning.
When it comes to major road construction projects, using Building Information Modeling (BIM) can bring some significant economic advantages. By cutting down on design mistakes, minimizing the need for rework, and allowing for more effective planning, BIM helps save costs. This boost in project efficiency and smarter decision-making ultimately leads to long-term financial benefits for the projects involved.
Also Read:
Could Carbon Fiber be the Superhero of Composite Building Materials?
Construction Design Management: Future of Construction Excellence
The Future of Construction: Reshaping Tomorrow with Innovation
Understanding the Difference Between Horizontal and Vertical Construction
What is Architectural Engineering? Architect vs. Architectural Engineer
Table of Contents