Design-Build and Design-Bid-Build are the most common delivery models in construction projects. These two are the most pervasively held practices of construction contracts, majorly classified based on their approach in prescribing ownership and roles in planning, managing, and executing the project.
On a broader aspect, Design-Build or DB is a single contract practice that involves entering into the term of service with one providing team aiming at an integrated solution and a single point of direction and responsibility. On the other hand, Design-Bid-Build or DBB is the delivery method that explores and uses separate contracts and sequential phases for design and construction phases. In this method the project owner controls most part of the communication and decision-making while being directly responsible for uncertainty and risk.
Design-Bid-Build is considered a more evolved approach in construction project delivery, while Design-Bid-Build is more of a conventional practice. While the first method is more about having a streamlined process and integrated delivery approach, the latter is more inclined towards cost-efficiency and control.
Choosing the right approach for your project is a must to achieve the optimum value and desired results. Here, in this article, we will dive deep and explore the major differences between the two with their advantages, limitations, and pros and cons discussed at length.
Project owners opting for Design-Build enter into a consolidated single contract with the construction services firm. This firm is responsible for managing every aspect of the construction project, including every function and service deliverable belonging to engineering, architecture, and structure, from design to construction and maintenance as applicable to the project. This method promotes collaboration between different stakeholders and the overlap of different functions and processes throughout the course of action.
Design-Build allows project teams to get started with construction works even before the designs are finalized. In this method, different professionals work in close coordination, and various departmental practices and functional resources operate in sync throughout the process to enhance efficiency and optimize output.
The process of Design-Build is initiated with the owner defining the scope of application and formulating a budget for the project. The owner sends an RFP looking for project proposals from different service providers and vendors. This step enters a new phase with a design-build team winning the bid and entering into a contractual agreement with the owner, where all the details related to the project scope, schedule, deliverables, resources, milestones, and contract cost are illustrated in detail.
With design taking over and getting approved as per the defined criteria and schedules, the project progresses towards the construction planning and implementation phases. Here, the sequences may adjust, and design and construction work may overlap across execution stages to streamline process compliance practices and optimize cross-functional deliverability.
If any changes or modifications are made in the process, those are signed off and executed to be finally updated in the process logs and reports with the required contractual adjustments. Significant gaps and possible risks observed in the process are addressed and placed under vigilance. Upon completion the owner and the service team have a review meeting, and finally the project is handed over.
Mentioned below are some of the key advantages of the Design-Build delivery model:
The Design-Build delivery model can have a significant impact on making the construction process lean and compact through integrated project delivery. With build and design teams working collaboratively, switching schedules to keep the process moving towards fast and diligent deliveries, it keeps the schedules compact, communication streamlined, and deliveries agile.
Designers and contractors working on the project are aligned on various aspects of design and build operations, going by the Design-Build method. The combined expertise of skilled professionals from different functional areas joining forces and working towards a unified goal in a process-integrated operational space enhances team collaboration and interplay, resulting in improved project quality and overall output value.
Various project risks that are supposed to be borne by the owner are transferred to the consulting agency or contractor taking up the project contract. In this contractual agreement, the service agency is legally bound to deliver as per the defined scope, working towards the project objectives and aligning deliverables with the owner's requirements. With cohesively appointed value metrics and well-measured and defined responsibilities, the consulting company has clarity of agenda and duty, with the operative responsibility and risk transferred to them with clear demarcations.
The Design-Build method promotes collaboration among stakeholders and allows them to act more connectedly and cohesively. This reduces the chance of miscommunication and misinterpretation, resulting in optimized workflows and deliveries. This extensively contributes to better time and schedule management to better align across the production system and saves significantly on the costs of operations.
Every system and method has its share of strengths and limitations, and so does the Design-Build delivery model. Here are some of the major challenges operators may face with Design-Build.
As the method runs on compact schedules, the contractors need to work on tight delivery timelines. The contracting firm's efficiency is measured largely through its turnaround time. If there is any situation where schedules are disrupted by any logistical or technical issues, or there is any gap in communication and interpretation around value objectives and compliance related to delivery schedules, it may end up in a process-wide conflict.
Design-Build delivery model supports dynamic processes where design and construction sequences overlap and different professionals act as per their action plans and schedules to eventually synchronize to align their cumulative functional efforts towards the core project plan and goal. If there is any gap in communication or a disconnect between these functional teams, it may result in process halts and breakdowns.
The contractors working on Design-Build models are at the helm of delivering solutions following a strict delivery timeline. This makes them prioritize deliverability over innovation. They are mostly focused on meeting the elemental performance metrics rather than experimenting with the flow and exploring new ideas and disruptive practices to be introduced in the process. This builds on the innovation opportunity cost for the project and results in the risk of reduced creative integration and value addition.
Design-Bid-Build delivery model is a traditional project delivery method that offers complete command of the process to the owner. In this method, the project owner signs a contract with different service providers based on different functions involving engineering and architecture teams separately. Besides, a central contract is signed with a general contractor for overall project execution and supervision. This approach allows different contractors to execute their part of the work following the prescribed sequence before the final construction work takes off.
In the Design-Bid-Build method, the owner has the most control and bears the major part of the responsibility and risk of the project turnouts. For any changes or modifications needed, the general contractor prepares a consolidated execution plan with revised cost orders and delivery notes to be screened and finalized by the owner. Following the necessary contractual submissions and handover communication, the owner reviews the final output with the GC and other contractors along with key project stakeholders.
Here are the key advantages and benefits of implementing Design-Bid-Build delivery models for construction projects:
The project signed with different contracting teams brings specialized focus across functions. Contractors have the clarity of approach and can work on their specific areas without having to worry about the overall execution, which brings clear segregation in the process.
With multiple contractors bidding for services, it allows the owner to select from the best available options in terms of skills, experience, capabilities, and pricing. The competitive bid proposals also allow the owner to negotiate with the agencies applying for different openings and aim for the best value through the contracts.
The Design-Bid-Build model puts the owner in the position of control over the service dynamics. The owner can choose a combination of service providers that are best suited for their work preferences and requirements. Also, as there is no pre-packaged team, the owner can decide on how the design and construction teams should be appointed in the system and how they should be placed in the service matrix for increased process efficiency.
As designs are finalized before the contractors are onboarded, the owner is able to better analyze the construction requirements, and based on that, the service teams are hired. This allows owners to assess the need for resources and identify the level at which the professionals need to be engaged, which provides the clarity and certainty of cost involved in the process.
Also Read : Usage of BIM Services in the U.S.A. & How are We Customizing Them?
Design-Bid-Build has a fair share of challenges on its side when it comes to the application and execution of contracts. Here are some of the points that may need to be dealt with more commonly and frequently:
As the implementation process in the Design-Bid-Build model has a sequence to follow, the construction cost analysis and budgeting may take time if the designs are not finalized or delayed for any reason. In extreme situations, it may also require reassessment and value engineering if the budget doesn't fall within the defined scope, which may cause further delay in the process.
As architects are not part of the implementation and execution phases, they know the least about material availability, logistical movement, and market costs. This may make them work on designs without looking into the practical insights and real-world scenarios. Reassessing designs and replanning logistical processes may add to procedural complexity and operational costs.
In the Design-Bid-Build method, contractors bid on the items that are explicitly mentioned in the agreement. Any changes or updates made to the contract later on may cause variations against the order created earlier. This may require a careful revision with clear accountability. If not processed accurately, this may cause a delay in schedules and may end up adding extended cost in the project.
Different functional teams and service operators involved in the project have their own way of working. This difference in approach and practice at the worksite may cause procedural lags and differences, leading to conflicts amongst stakeholders. As a result of this disalingment between teams, there could be performance issues and complications in the process which may impact timelines or increase the cost of the project.
Mentioned below are the various factors to consider while choosing the right model for your project.
Choosing the Design-Build model for your project is more apt and applicable in the case:
Choosing the Design-Bid-Build model makes more sense in the case:
Design-Build and Design-Bid-Build models have their own set of advantages and drawbacks. None of the delivery methods is completely perfect in itself, but one can be more relevant and a better choice over the other depending on the project type and the owner's requirements. It is always a wise approach to understand different facets and nuances of the offerings of both models and compare these head-to-head to know which is more viable to opt for in your case. To be sure you do not fall for the wrong idea and head in the right direction, consult seasoned professionals to navigate challenges in the process and explore the best possibilities before you start seeking the solution, adopting the right model for your project.
In the Design-Build model supported process, design and construction teams come together to serve under a unified agreement or master contract. This contractual engagement promotes early collaboration and streamlines communication between the project participants. The model is built on the principles of single accountability and compact processes, which lead to better process compliance and faster resolution of conflicts, making it the go-to model for time-sensitive projects.
For the projects that are complex in nature, Design-Build construction is the project delivery method to go for. As it has unified design and construction teams, it easily adapts to the changes, seamlessly aligns through the technological process, and manages risks dynamically.
In the Design-Bid-Build projects, communication flows through a formal channel as the teams operate discreetly and have an autonomous position to serve in the project. In the case of Design-Build, the teams can communicate directly and collaborate seamlessly without following a defined protocol as they are appointed and controlled centrally.
Yes, Design-Build services can be scaled to fit small building projects as well as large commercial and infrastructure projects. The Design-Build delivery model adapts well to the size requirements as they go by unity of direction and control and have teams working in tandem to proactively act towards the varying needs of project delivery, resource arrangements, and compliance practices.
Must Read
What is Rebar Lapping, Lap Slice and Development Length: Mistakes to Avoid
What is Line Pattern Purger ? - REVIT Add-ins
Donation of 5 Ventilators to Health World hospital, Durgapur
What ist Imported Categories Cleaner ? - Revit add-ins
RoomWise
BIM Automation Checklist - Right Approach & Practices for the Construction Industry
Table of Contents