Project Area:123,368 Sq Ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:123,368 Sq Ft

Architect:N/A

Engineer:N/A

Contractor(S):N/A

Owner:Linbeck Group

Trades Covered:Concrete, Embed & Reinforcement 3D Model

LOD:300

Software:Revit 2020 for Concrete Model & Tekla 2020 for Reinforcement Model

Verticals:  Rebar/Reinforcement Contractors, Concrete Contractors

National Medal of Honor Museum

The National Medal of Honor Museum is a museum that honors United States Armed Forces Medal of Honor recipients, founded and funded by the National Medal of Honor Museum Foundation. The museum is planned to open in 2024 in Arlington, Texas, with groundbreaking beginning in March 2022.

The location was announced on October 4, 2019, concluding a 5-year, nationwide competition that included Denver, New York City, San Diego, and Washington, D.C. It is projected to cost $150 million and open in 2024.

Key Project Details

Project Area:123,368 Sq Ft

Architect:N/A

Engineer:N/A

Contractor(s):N/A

Owner:Linbeck Group

LOD:300

Trades Covered:Concrete, Embed & Reinforcement 3D Model

Software:Revit 2020 for Concrete Model & Tekla 2020 for Reinforcement Model

Verticals:  Rebar/Reinforcement Contractors, Concrete Contractors

Scope of Work:

 

  • Pinnacle was responsible for creating a 3D Concrete model.
  • Pinnacle was responsible for creating a 3D Reinforcement & Embed Model.

 

Challenges & Solutions:

 

Challenge :
It was very difficult to model the slab reinforcement due to the circular shape of the slab on grade.

 

Solution :
Pinnacle split the slab concrete model as per pour sequences and modeled the slab reinforcement by using Tekla’s circular bar group feature.

 

 

 

National Medal of Honor Museum image 1

 

 

 

National Medal of Honor Museum Drawing 2

 

 

 

 

 

Pinnacle’s Value Addition:

 

Pinnacle extracted reports from Tekla structures for size, quantity, and other information on reinforcements.

 

  • Rebar quantity take-off report format

 

 

 

National Medal OF Honor Museum image 3

 

 

 

 

Outcomes:


1.  Concrete 3D Model

 

 

 

National Medal OF Honor Museum Drawing 4

 

 

 

 

 

 

 

 

 


2. Reinforcement 3D Model

 

 

 

National Medal OF Honor Museum Drawing 5

 

 

3. The Tekla Reinforcement model coordinated with the Revit concrete model

 

 

 

National Medal OF Honor Museum Drawing 6

 

 

 

 

4. Mega column foundation

 

 

 

National Medal OF Honor Museum Drawing 7

 

 

 

 

 

National Medal OF Honor Museum Drawing 8

 

 

5. Entry ramp at Rotunda level

 

 

 

National Medal OF Honor Museum Drawing 9

 

 

 

 

 

National Medal OF Honor Museum Drawing 11

 

 

 

 

6. Utility pad

 

 

 