3D Concrete Modeling Services For the National Medal of Honor Museum

Location Arlington, TX, USA

Year May 2022 - June 2023

Key Project Details
share link

Project Area:123,368 Sq Ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:123,368 Sq Ft

Architect:N/A

Engineer:4 - 5

Contractor(S):N/A

Owner:Linbeck Group

Trades Covered:Concrete, Embed & Reinforcement 3D Model

LOD:300

Software:Revit 2020 and Tekla 2020

Verticals:  Rebar/Reinforcement Contractors, Concrete Contractors

National Medal of Honor Museum
Mega Column Foundation
Entry Ramp at Rotunda Level
National Medal of Honor Museum
National Medal of Honor Museum
National Medal of Honor Museum
National Medal of Honor Museum
National Medal of Honor Museum
Rebar Quantity Take-off Report Format
Reinforcement 3D Model
The Tekla Reinforcement Model Coordinated with the Revit Concrete Modele
Utility Pad
Concrete 3D Model

3D Concrete Modeling Services Project Overview

The National Medal of Honor Museum in Arlington, Texas, is dedicated to honoring Medal of Honor recipients from the United States Armed Forces. Pinnacle supported the project with detailed concrete, embed, and reinforcement modeling.

Scope of BIM Services for Concrete Contractors

  • Developed detailed 3D Concrete modeling using Revit 2020.
  • Created a coordinated reinforcement and embed model using Tekla 2020.
  • Delivered BIM reinforcement modeling for complex structural elements.
  • Extracted reinforcement size, quantity, and related reports from Tekla Structures.
  • Provided Concrete BIM services to support accurate project coordination and documentation.
Key Project Details

Project Area:123,368 Sq Ft

Architect:N/A

Engineer:4 - 5

Contractor(s):N/A

Owner:Linbeck Group

LOD:300

Trades Covered:Concrete, Embed & Reinforcement 3D Model

Software:Revit 2020 and Tekla 2020

Verticals:  Rebar/Reinforcement Contractors, Concrete Contractors

Challenges & Solutions of the Museum Project

Modeling slab reinforcement presented challenges due to the circular geometry of the slab on grade. Pinnacle divided the slab concrete model according to pour sequences and used Tekla's circular bar group feature to model the reinforcement accurately.

The coordinated Revit and Tekla workflows enabled Pinnacle to deliver a detailed 3D Concrete model and reinforcement model while maintaining coordination between concrete and reinforcement elements.

National Medal of Honor Museum

National Medal of Honor Museum

Pinnacle's Value Addition

Pinnacle's BIM Services for Concrete Contractors supported accurate modeling, reinforcement coordination, quantity reporting, and constructability for complex concrete elements.

Rebar quantity take-off report format

Rebar Quantity Take-off Report Format

Outcomes:

1. Concrete 3D Model

Concrete 3D Model

2. Reinforcement 3D Model

Reinforcement 3D Model

3. The Tekla Reinforcement model coordinated with the Revit concrete model

The Tekla Reinforcement Model Coordinated with the Revit Concrete Modele

4. Mega column foundation

Mega Column Foundation

5. Entry ramp at Rotunda level

Entry Ramp at Rotunda Level

6. Utility pad

Utility Pad

next-arrow Previous Project

150 Bocana Street

View Next Project next-arrow

840 Eglington

We'd Love To Hear About Your Next Project.

Let's Talk