Singapore MRT

Location Singapore

Year June 2021 - December 2029 (Estimated)

Key Project Details
share link

Project Area:NA

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:NA

Architect:NA

Engineer:6 BIM Engineers

Contractor(S):NA

Owner:NA

Trades Covered:Civil, Architecture, Structure & MEP

LOD:400 / 500

Software:Revit 2021 & Tekla 2021

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services
Singapore MRT

Overview:

 

Pinnacle worked on one of the biggest MRT stations in Singapore. It is an underground Mass Rapid Transit station in Singapore. Underneath the Central Bus Interchange, the station serves various landmarks, including a shopping mall and sports hall.The Singapore Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country’s principal mode of railway transportation. The MRT is integrated with other public transportation options, such as buses and light rail systems, which act as feeder services. Pinnacle was entrusted with 3D BIM modelingand other services for the associated tunnel.

 

Scope Of Work:

  • • Model Creation – BIM Model for design integration and clash coordination services, along with construction drawings for the station and associated tunnel.
  • • Model Validation – Validation of the BIM Model received from the client in accordance withthe design drawings and general standards.
  • • Model Coordination for MEP – MEP design servicesandcoordination with themodel received from the client and other contractors in accordance with the design drawings and other inputs.
  • • Shop Drawings – Creation of 2D shop drawings from the clash-free coordinated model for final approval and construction
  • • 4D Simulation -4D Construction Simulation Servicesfor progress tracking
  • • 5D QTO – Preparation of the 5D model to extract the quantities during the interim payment claim.
Key Project Details

Project Area:NA

Architect:NA

Engineer:6 BIM Engineers

Contractor(s):NA

Owner:NA

LOD:400 / 500

Trades Covered:Civil, Architecture, Structure & MEP

Software:Revit 2021 & Tekla 2021

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services

Challenges Faced & Resolution:

 

Challenge 1: Occasionally, obtaining information from other stakeholders during coordination proved difficult. We frequently encountered delays while awaiting additional information and references for project execution.

Solution 1: To address this issue, we proactively completed the entire model using fundamental information early on. We then shared this preliminary model with the client and other stakeholders, allowing them to identify critical areas in advance and update their own models accordingly.

Challenge 2: We were required to commence the entire task without adhering to any established drawing standards. Consequently, we relied on client reviews and annotations to finalize the job.

Solution 2: Given that we embarked on a new project in a region with unique requirements, specifically in generating civil service shop drawings, there existed no predefined drawing standard. Therefore, leveraging our expertise and a few sample drawings, we formulated a comprehensive standard for the entire project, encompassing models, shop drawings, and coordination of various services. This standard was shared with the client for their review and approval. Subsequently, the project proceeded successfully in accordance with the agreed-upon standard.

 

Pinnacle's Value Addition:

 

We resolved several data conflicts by raising RFIs about those. Multiple structural configurations were adjusted to prevent clashes. These modifications were implemented through advanced software applications and put through exhaustive scrutiny to achieve the utmost precision and streamline time efficiency.