The construction industry has evolved substantially since the advent of computer-aided design and Building Information Modeling.
From manual drawings and clash detection, engineers have now shifted to digital 3D models and automated clash detection. This revolutionary shift was possible because of BIM seamlessly integrating within the construction atmosphere.
BIM has addressed several long-standing pain points driving the construction industry towards more sophisticated workflows.
BIM-based workflows enhance design accuracy, increase speed with precision, and support a common environment for all stakeholders to communicate efficiently.
However, on-site problems continue to be a key challenge during project execution.
Weather dependency, labor costs and availability, worker safety, all these aspects still drag on-site productivity, causing project delays.
In sectors like housing, healthcare, and commercial areas, access to the market speed is critical.
Recent reports from the Modular Building Institute (MBI), a non-profit association dedicated to modular construction, in two industry sub-segments, permanent modular construction and relocatable buildings, forecast that the U.S. modular construction market will grow from $20.3 billion in 2024 to $25.4 billion by 2029.
California, in the western U.S., leads with the highest growth rate and a market value of $7.5 billion, among the Northeast, South, and Midwest.
Surveys reveal this is fueled by the rising housing demand and the initiation of high-stakes data center projects in the state.
So, Modular Construction is the next innovative approach to redefine several things in construction work.
It is a process of manufacturing building components in modules or sections within a controlled factory environment.
These are transported to the project site and assembled together, forming a complete building with the same building codes as mentioned in the project documentation.
Also, a lesser-known fact is that modular construction has been around for decades. It started gaining traction in the early 20th century, after the Second World War, as a faster solution for housing shortages.
It was first introduced during the United States' expansion when the California Gold Rush happened.
The transportation of modular housing from the East Coast to rising localities in the West continued to take shape into a major industry element as off-site construction.
The benefit is that these structures are created with the same standards and the same architect specified materials, as it would have been if in site built projects.
Hence, structural integrity and building resilience are not affected; however, labor costs, procurement, and logistics costs reduce substantially.
Modular buildings are complete structures originating from the precise alignment and joining of multiple prefabricated modules. Unlike conventionally constructed buildings, these buildings arrive at the site as modules that are assembled with reference to the BIM model, forming a complete structure.
These are versatile creations in the modern age construction sector, which can be disassembled and reassembled effortlessly. This flexibility proves to be invaluable for shiftings, as all the floors, walls, and prefabricated modules are strongly attached.
Such prefabricated modules are also known as modular structures, which are created in factory setups. Fabricators ensure alignment with the desired codes and standards to ensure smooth on-site workflows and maintain project standards.
These buildings can be a perfect fit for residential homes, offices, and healthcare facilities.
While modular buildings are suitable for residential and commercial purposes, a part of it can also be beneficial for industrial setups.
These are the reasons where heavy equipment is needed for various processes, for example, water treatment plants or power generation systems, where equipment readiness is crucial.
The demand gives rise to modular skid-mount systems, which are more convenient to be assembled on site and transport.
Skid-mount systems are used for industrial setups, where heavy equipment is in action. Their installation is a tedious and time-consuming task, with lots of complexities.
The primary challenge is that during the installation of a particular machinery or equipment, the rest of the setup still needs to continue working.
This makes the installation process complex and also increases labor costs and gives rise to safety risks. However, modular skid-mount systems completely change the scenario where fully assembled equipment is directly transported to the site.
There is no setup process, and installation means plug and play. The equipment and other sub-machines are mounted for support with a skid. And hence the name of the approach.
Let’s uncover,
Industrial setups: Industrial skid-mount systems are applied in complex tasks where productivity and quality matter. In the processing environment, these systems facilitate the transport, transportation, and organization of materials and the mixing of various chemicals and temperature regulation.
Water Treatment Systems: These are pre-engineered water treatment systems designed for seamless transportation, installation, and operations. The complete system is attached firmly to a skid-mount and hence can be used in various environments.
Power Generation Systems: Power generation systems are sophisticated, with lots of equipment connected within a steel frame. Several types of power generation systems can be used with a single frame. These are solar, wind, and hydro systems, each prepared to serve its intended purpose while staying connected to he skid-mount systems.
While modular construction is a new-age innovation and makes things easier, we also need to face the other side. Let’s have a look at the advantages and disadvantages of modular construction.
Before considering modular construction for your next project, understanding these setbacks is critical, and we have listed them below.
The integration of BIM redefines the modular construction and prefabrication workflows. BIM brings in a digital approach that simplifies the design and construction process, and also ensures alignment with the building codes and standards.
Let's go through the process through which modern contractors are using BIM-driven modular construction to build high-rises.
It all starts with the conventional BIM workflow, where the 3D model of a structure to be built is developed. To explore that process, click here.
The BIM model is considered ready once the desired LOD (Level of Development) is achieved, there are no clashes, and it is aligned with the project documentation. Once this is done, BIM professionals divide the model into multiple modules.
Engineers collaborate in a Common Data Environment and work on each module separately. They ensure the highest quality control, offering conflict-free assembly.
BIM companies provide these modules to the manufacturer company. They further feed these models into their manufacturing software.
The software extracts the model data, including dimensions, material data, and assembly instructions. The greater fact is that advanced modular construction factories operate through automated robots.
The robots are fed with the BIM model data, based on which they construct the modules with millimeter-level accuracy.
Logistics and sequencing cause the maximum downtime during the actual construction. As there are many things to deal with, including cranes, trucks, sequential installation, etc., an efficient plan is required.
BIM helps in visualizing the transport, manufacturing, and module installation around the construction site. This ensures synchronization among them, and actual execution happens as per the plan.
Through hyper-realistic visualizations, professionals try and test different plans, finally coming up with one that delivers the best maximum uptime. Hence, projects can be delivered faster with the combined benefits of modular construction and Building Information Modeling.
While the modular construction approach makes things faster, it may cause delays during on-site installation.
Incorrect installation guidance, faulty modules, or skid mounts in modular construction projects can be eliminated with the help of BIM. The BIM model is used as a master reference to install the modules along with an automatically generated by BIM software application.
And when BIM is integrated, you can also take advantage of VR and AR solutions. These help you assemble modules in a far better way and identify any conflicts faster and in a more advanced way.
Once the modules are installed, the BIM model now has all the updated data and machine stats, acting as a digital twin.
This digital twin, when connected with IoT sensors installed into the machinery or equipment, sends real-time data to the model. Professionals can monitor, analyze, and take predictive actions to carry out efficient facility management and achieve maximum uptime.
BIM makes all of these possible, bridging the gap between the as-built model and real-time data from the modules.
So, these are the profound ways through which BIM helps in enhancing the efficiency of modular construction.
A far more sustainable approach instead of traditional construction. With the growing demands for sustainable buildings, the industry has already taken a number of steps.
From the use of sustainable materials for floors and roofs, to using eco-friendly alternatives for wall insulation.
Modular construction techniques integrated with sustainable construction methods lower carbon footprints and construction waste. The "Prefabrication and Modular Construction 2020" report from Dodge Data and Analytics revealed that 68% of architects and contractors said that modular construction had a medium to very high impact on construction waste reduction, depending upon the project category.
In 2024/2025, a peer-reviewed paper states that in comparison with on-site construction work, modular construction generates approximately 83.2% less construction waste.
BIM offers advanced processes for accurate material quantification and high-quality energy consumption simulation.
Bills of quantities and Bills of materials can be automatically generated from 3D BIM models and are used to eliminate material wastage from wrong procurement.
Further, BIM helps in simulating the complete energy consumption of modules individually. This helps in getting the right amount of energy usage that reduces the carbon footprint from buildings.
Material and Waste Optimization: BIM enhances the selection of materials even in modular construction. The system identifies materials with higher carbon footprints early in the current material bill, and suggests more sustainable and structurally sound alternatives. Hence, while modular construction inherently cuts down construction waste, eliminating on-site fabrication, BIM amplifies the outcomes by tracking the attributes of materials used in the fabrication environment.
Reduced Energy Consumption & LCAs: BIM allows professionals to assess a building’s or a module’s lifecycle embodied carbon. It powers the simulation of energy consumption and energy usage across various scenarios. All these capabilities can be harnessed to not only enable cleaner and faster on-site work but also ensure the eco-friendliness of the structure throughout its life.
Reduced on-site work: When structures are built with a modular construction approach, several benefits already show up. These include reduced waste, no weather impact, and no rework. Now, BIM comes as a catalyst, amplifying the benefits by offering fabrication-ready drawings and detailed assembly instructions. Further, site teams also have access to the federated BIM model, which makes the assembly easier, faster, and more accurate. Hence, with a modular + BIM approach, on-site efficiency is maximum with the lowest downtime.
All in all, if modular construction is redefining the on-site construction approach, BIM further enhances it with 3D modeling, visualization capabilities, and data-driven accuracy. From the construction of 3D models to dividing them into modules, and planning logistics and module installation sequence, BIM covers it all.
Also Read
What Are Common Quality Control Measures at a Construction Site?
BIM 3D Modeling Impact on Japanese Construction
Revit Family Creation: A Guide to Building Smart Models
Pinnacle Infotech: Redefining Efficiency in Japanese Construction
Understanding Construction Documents, Purpose and Types
What is Industrial Construction? Processes, Types, Costs, Challenges, and Workflows
Table of Contents