• Home
  • Portfolio
  • Projects
  • Mechanical BIM Modeling Services for Amgen Pipe Bridge Assy

Mechanical BIM Modeling Services for Amgen Pipe Bridge Assy

Location Houston, Texas, USA

Year 7 September, 2022 - 10 January 2023

Key Project Details
share link

Project Area:NA

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:NA

Architect:NA

Engineer:2

Contractor(S):

Owner:

Trades Covered:Mechanical

LOD:400

Software:Revit 2011

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services
TAS branded industrial cooling tower paired with a modular containerized building
Engineering spool drawing for industrial cooling tower
Engineering fabrication drawing for a pipe rack

Amgen Pipe Bridge Assy is an industrial plant located in Houston, Texas. Pinnacle’s scope for this mechanical BIM modeling project included converting the 3D model of process piping and equipment from Revit to Revit Fabrication. We also delivered coordinated shop drawings, spool drawings, and assembly drawings for pipe rack piping to support accurate fabrication and installation.

Significant Aspects of the Project

  • • Revit-to-Revit Fabrication Model Conversion
  • • Industrial Plant – Pipe Bridge Assembly
  • • Coordinated Shop, Spool, and Assembly Drawings for Pipe Rack Piping

Process Piping BIM Modeling Scope for the Amgen Pipe Bridge Project

Our scope of work for the project included the following:

1. 3D BIM Model Creation

A. Process Piping BIM Modeling Services

Conversion of the client’s 3D model of Process Piping and Equipment from Revit to Revit Fabrication, including but not limited to:

  • • Process piping, routing, and layout
  • • Pipe rack piping systems
  • • Equipment placement and tie-ins
  • • Fabrication-ready piping components

B. Model Development

The process piping and equipment model was developed based on the received Revit-linked input and progressed to a fabrication-ready level suitable for producing coordinated shop, spool, and assembly drawings.

2. Shop Drawing & Spool Drawing Services

Preparation of detailed shop drawings, spool drawings, and 2D assembly drawings derived from the fabrication model, aligned with project coordination requirements for Pipe Rack Piping.

3. Preparation of Drawing Sets

Preparation of the following drawing sets:

  • • Shop Drawings
  • • Spool Drawings
  • • Assembly Drawings for Pipe Rack Piping
Key Project Details

Project Area:NA

Architect:NA

Engineer:2

Contractor(s):

Owner:

LOD:400

Trades Covered:Mechanical

Software:Revit 2011

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services

Challenges in Mechanical BIM Modeling for Amgen Pipe Bridge & Our Solutions

Extracting Data from Client-Provided Revit-Linked Files

Challenge: The client provided a Revit-linked file, and extracting usable project data from it presented a certain challenge.

Solution: Held daily meetings with the client to discuss doubts related to project specifications, which helped establish a smooth and operational workflow throughout the process.

Limited Client Familiarity with BIM Software Workflows

Challenge: The client's team required greater familiarity with BIM tools to streamline engagement and implementation.

Solution: Provided the client with knowledge of BIM and the BIM software Navisworks and Revit, streamlining the process of engagement and implementation.

Pinnacle's Value Addition Through Process Piping BIM Services in USA

Fabrication-Ready Revit-to-Revit Conversion

Enhanced project outcomes by converting the client's process piping and equipment model into a coordinated, fabrication-ready Revit Fabrication model, supporting accurate shop, spool, and assembly drawing production for Pipe Rack Piping.

Proactive Client Coordination for Data Accuracy

Contributed to project success by holding daily coordination meetings to resolve data-extraction challenges from Revit-linked files, minimizing rework, and maintaining a smooth production workflow.

Project Outcomes of Amgen Pipe Bridge BIM Modeling Services

Engineering fabrication drawing for a pipe rack

View Next Project next-arrow

Architectural BIM Modeling for Recreation Center Big Horn Wyoming

We'd love to hear about your next project.

Let's Talk