MEP or Mechanical, Electrical, and Plumbing is one of the most complex areas in construction.
Even while they operate largely out of sight, they facilitate air movement, power distribution, water supply, temperature management, etc.Apart from these, MEP systems are highly interconnected and demand very precise coordination. For example, in a building with numerous MEP systems, cross one or the other electrical conduit or structural beam.
Hence, a small design error or quantity takeoff can create inconveniences costing several thousand dollars.
Because of this complexity, MEP estimation services are not the typical quantity takeoff or construction cost estimating services. It is far more than counting ducts, pipes, cables, and equipment.
MEP estimates need to be accurate and must account for the scope, quantities, specifications, and material costs. There is enough room for human errors and unnoticed mistakes to occur here.
In this blog, we will be discussing the seven costly mistakes to avoid during MEP estimation. But before that, let’s have a look at how professionals prepare modern MEP estimations.
Traditional MEP estimates involved simply measuring components from project drawings and multiplying quantities by unit costs.
But the modern estimation, be it plumbing estimating services, has drastically changed from that. Mechanical estimating services and electrical estimating services also fall under the MEP category.
It is now a structured process that begins from the 3D model. Unlike the traditional approach, here modern estimates include design information, quantities, specifications, pricing, and project requirements.
The combination of this data gives a much larger picture to project teams to forecast the expected cost.
If we put it simply, as the amount of details in the data increases, so does the accuracy of the estimates rise.
Let’s look at the exact workflow that professional MEP mechanical estimators use for this.
So, the first step is to perform a detailed review of the designs.
Estimators usually get designs from various trades, such as architecture, structural, and MEP.
They might also review other available project documents to get a better idea of how the systems interact. The end goal is to understand the MEP scope for which the bid will happen.
After establishing the MEP scope, estimators start quantifying the elements.
These include materials, equipment, and components across the MEP services. This is the exact step where modernization enters. The professionals use coordinated BIM models, where the software auto-generates all the required project information.
Now, to make this happen smoothly, BIM modelers need to design error-free, federated models.
Once the process of extracting the quantities is complete, they need to be mapped. Estimators connect the quantities with the corresponding material. To make the estimate more detailed, they map the material quantities with relevant labor costs, equipment, and installation costs. This is one of the most critical steps, as it transforms a regular MEP components list or plumbing takeoffs into a structured cost estimate. It is now usable for budgeting, bidding, and procurement planning.
Professionals perform the quantity extraction and bid building process within a virtual environment.
However, the project conditions and coordination challenges affect the estimate in plumbing projects.
For example, if there are coordination issues, a specific material might require additional quantities, or the specification might change. Hence, along with that, professional MEP estimators also consider design constraints, system coordination, and other project-specific conditions.
After all the above considerations, the final estimate output goes to the review process. They review it for quantity emissions, scope gaps, and inconsistencies. Modern MEP estimates are dynamic, so an estimator’s job does not end here. As the project develops, they continue to track the changes and ensure their impacts are accurately reflected in the estimate.
So, as we can understand, the above process extends far beyond the basic takeoff process. Here, MEP estimations aim to arrive at an output that contractors can trust.
And this is where many projects face hiccups, even with a structured estimation process. There may be minor oversights, but they can lead to significant cost discrepancies and procurement challenges.
Here are the seven costly mistakes you need to avoid during MEP estimation.
This is the most common problem estimators face during MEP installation.
By default, MEP drawings are complicated and need expert intervention to understand them. Several companies looking for MEP estimates do not have a federated BIM model.
Hence, estimators often begin the process from drawing sets that may or may not reflect the latest design revisions or updated equipment schedules.
As a result, the estimation they prepare displays material quantities that are irrelevant to the project. For example, after an estimate is prepared, the HVAC systems may undergo revisions due to on-site constraints. Here, if additional ductwork, equipment, or fittings are added, the source drawing does not reflect that in the detailed quantity takeoffs.
How to avoid: The solution is to introduce a document version control process. Before the estimate, there can be multiple meetings with the client to ensure that you get the latest drawings.
There is more to the process than just calculating major equipment and quantity.
A precise estimate will even have details about supporting material, accessories, and connections.
Several mechanical systems cannot work without additional equipment. Those also fall under the estimate, and estimators need to address those carefully. An example could be of HVAC estimating services, where, apart from the air conditioning units, there are several supporting elements.
If the estimated elements such as, insulation, dampers, controls, and associated piping, a significant cost gap appears. Similarly, plumbing estimations include details for drainage and sewer connections.
A similar thing applies to electrical and plumbing systems, as these are delicate systems, whether it is for commercial or residential projects. And missing minor components can add up to rework and unsuccessful bids.
How to avoid: There is an easy way to tackle it in-house to increase the reliability of MEP estimation services. The process comes down to breaking down materials by system and disciplines. Then, instead of considering only the drawings, estimators must also use specifications, schedules, and equipment information. Using all these together, they can build a complete scope that can help finalize the estimate.
Amidst the digital evolution in the construction industry, manual MEP takeoff services are slowly losing ground.
However, for smaller projects, that is still the best way to create project budget estimates.
However, if we are talking about a stadium, an airport, or industrial projects, then it completely changes the scenario. In such projects, the MEP systems are overly complicated.
Here, manual takeoff would take years to get any reliable results. Moreover, manual takeoff is not a practical solution for MEP estimates here.
Song with human error suspects, the real problem lies in the design revisions of construction project plans. Every minor change will require the estimator to repeat that portion of the takeoff. Here, BIM-based MEP cost estimates solve the challenge.
Estimators refer to the material quantities that come from the federated BIM model. Instead of manual takeoffs, they work on a model-based approach that evolves along with the project.
How to avoid it: As we already talked about, digital takeoff and model-driven quantity extraction. Here, the real challenge is that owners are not changing their mindset. They need to move on from manual quantity extractors to a digital process with advanced software that is more accurate and reliable.
One thing we have to understand is that an MEP estimate is always connected to the design information.
The more accurate the design information, the better and more reliable the cost estimation. And this is no surprise that construction projects rarely stay the same.
Multiple factors, such as route modification to avoid clashes, evolving client requirements, and plumbing contractors’ changes, affect MEP layouts. And the greater fact is that each of those changes can affect quantities and ultimately the project cost.
However, if the workflow is manual, the estimation team often stays unaware of every change. For example, the electrical team may have communicated their changes, while the electrical or HVAC designers have not. This creates a discrepancy between estimated and actual costs and fails to give accurate cost estimation.
How to avoid it: The best solution for this is also a mindset shift of the estimation teams. While providing MEP estimation services, teams should think they are in a revision-controlled process. This means that any design changes occurring should be vetted for impact on the MEP elements or specific mechanical components. When you treat the estimation process as revision-controlled, you would never consider any estimate final.
The cost data of materials also plays an important role here in mechanical takeoffs. Until now, we have talked about considering all the important factors, such as design changes, drawing version, and the design model.
However, the market value of material, equipment, and supporting elements is immensely critical to the process. Estimators may extract the accurate quantities using the model-driven process.
But the accuracy of the estimate is not guaranteed if estimators have considered outdated cost information. Based on location, supplier, specifications, and market conditions, material prices vary and affect estimations.
In the digital estimation process, estimators use a cost database in MEP cost estimation. This is the fundamental thing for construction project cost estimates before the delivery date. However, during the process, estimators can bring in prices from different sources with a consistent assumption.
As a result, the final estimate will be distorted, and project managers cannot use it for budgeting or bidding.
How to avoid: To avoid this mistake, the best solution is to work with current and zip code based pricing. Before preparing a detailed estimate, estimators should review the project specification locations and the applicable codes that can affect material costs. They also need to distinguish between material, labor hours, equipment, and installation costs.
As we already know, MEP systems do not exist independently. They exist in the same space as the architectural and structural components.
Simply, MEP systems always stay in coordination with other building elements.
Now, several MEP cost estimators do not consider this coordination part. When they only consider MEP drawings, they miss out on this coordination part, which heavily affects quantities.
For example, a simple route may appear straight in the drawing, but in reality requires additional fitting for installation. Estimates that do not consider the coordination part completely miss this reality.
As a result, there are inaccurate estimates, and they have to rework them.
How to Avoid: The primary challenge is that the coordinated model is not always available during the process. Depending on the project requirement, estimations may have to begin the process without model data. In such cases, they can start the process while being mindful of the upcoming revisions.
The initial purpose of the estimation is to move forward with the bidding process.
However, once that is done, this estimate accounts for the complete project spend. Many estimators think that estimation ends when the bid is ready.
In modern construction projects, such estimates quickly lose relevance due to several factors. Some of those we already discussed in the previous section are the mistakes that impact cost efficiency.
How to avoid it: Estimators who follow digital processes treat the estimation as an ongoing process. As the project evolves, the cost estimation evolves. Digital estimating software has become so advanced that it can readily view cost deviations for accurate estimates.
So, these were the most common but costly mistakes that can occur while providing MEP estimation services. And in order to avoid these mistakes and acquire more projects, most firms plan to hire an experienced estimator to eliminate cost overruns. But that can quickly become another blunder, as the solution is a structured in-house process. It requires connecting design information, quantity takeoffs, and current pricing data, taking it through a digital workflow. Seasoned electrical estimating services use software like Bluebeam and Trimble.
Must Read
What is Procurement in Construction Industry?
MEP Design Services Building Futuristic Models
Complete Guide to Avail MEP Engineering And Design Services from Pinnacle
MEP Engineering Services
Revolutionary MEP BIM Services by MEP Specialists
We have received your submission and our team will contact you soon.
Table of Contents