Crestavilla

Location Laguna, Niguel, California, USA

Year December, 2015 - May, 2016

Key Project Details
share link

Project Area:404,019 sq. ft.

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:404,019 sq. ft.

Architect:

Engineer:4 Engineers

Contractor(S):

Owner:Steadfast Crestavilla Senior, LLC

Trades Covered:Architecture

LOD:300

Software:Revit

Verticals:  Commercial

Explore BIM Services
a 3D architectural rendering of Crestavilla with red-tiled gabled and flat roofs
an architectural 3D conceptual model of crestavilla
architectural 3D rendering of a multi-family residential with distinctive red tile-style pitched roofs

Architectural BIM Modeling for Crestavilla

Crestavilla is a large-scale residential development in Laguna Niguel, California, spanning 404,019 sq. ft. The development comprises a garage level and three floors above ground.

Pinnacle delivered architectural BIM modeling services to develop a coordinated 3D representation of the building based on the available contract drawings. The model covered key architectural elements, supporting design visualization, drawing validation, and early identification of potential construction issues.

3D Architectural Modeling Scope of Work

Pinnacle’s scope focused on developing an LOD 300 architectural BIM model based on the available contract drawings.

Key deliverables included:

  • •3D modeling of internal partitions and external wall assemblies.
  • •Modeling architectural openings and associated components.
  • •Developing ceiling layouts and soffit details.
  • •Modeling stairways and associated architectural elements.
  • •Developing the building’s roof geometry.
  • •Incorporating design clarifications and updating the model based on RFI responses.
  • •Reviewing architectural elements for consistency and identifying potential design discrepancies.
Key Project Details

Project Area:404,019 sq. ft.

Architect:

Engineer:4 Engineers

Contractor(s):

Owner:Steadfast Crestavilla Senior, LLC

LOD:300

Trades Covered:Architecture

Software:Revit

Verticals:  Commercial

Explore BIM Services

Challenges & Solutions

Incomplete Design Documentation

Challenge: The client-provided drawings contained limited information, making it difficult to develop an accurate architectural BIM model within the available timeframe.

Solution: Pinnacle leveraged its team's experience and expertise to interpret the available drawings and complete the architectural model despite the limited inputs.

Multiple Level Differences

Challenge: The project had multiple level differences, which complicated architectural modeling and made it challenging to maintain accuracy across the building.

Solution: Pinnacle developed the architectural model based on the available contract drawings and incorporated updates as per client RFI responses.

Insufficient Elevation Details

Challenge: More than ten elevations were provided without proper supporting information, making it difficult to interpret the architectural design accurately.

Solution: Pinnacle raised technical queries to address missing information and clarify drawing discrepancies before incorporating the relevant details into the model.

Pinnacle's Value Addition

Pinnacle's architectural BIM modeling expertise helped the client identify design errors and resolve drawing discrepancies before construction. Key contributions included:

  • Early Error Identification: Identified discrepancies in ceiling heights and potential clashes between walls and structural columns through virtual construction.
  • RFI-Based Resolution: Raised approximately eight RFIs to address missing information and inconsistencies in the contract drawings.
  • Reduced Construction Risks: Helped resolve design issues before construction, reducing the likelihood of rework and associated costs.
  • Improved Project Planning: Supported better construction planning by highlighting drawing errors and resolving potential conflicts early.
View Next Project next-arrow

Teatulia Commercial Building

We'd love to hear about your next project.

Let's Talk