Pinnacle provided Structural BIM Modeling Services to develop detailed concrete shop drawings for the Westside Water Treatment Buildings 580 and 581 in Los Banos, California. The project involved creating 3D BIM models and preparing construction drawings for various structural concrete elements.
Pinnacle’s scope included:
Contractor(s):Peck & Hiller Company
Challenge: Pinnacle initially followed the dimensions provided in drawing 581-S4-01, starting from the upper-left corner near grid intersection U-24. A discrepancy was identified in the angular dimensions.
Solution: Pinnacle requested that the client review and confirm the issue. They clarified that the corner angles were expressed in degrees and minutes rather than decimal degrees. Our team converted them into decimal degrees using the provided CAD files.
Challenge: Drawings 581-S4-03 and 580-L1-02 showed different top-of-slab elevations for the Level 2 slab of the Transmission Pump Station.
Solution: Pinnacle requested confirmation of the correct top-of-concrete elevations. The client instructed the team to follow the structural slab elevations, consider the topping slab details in drawings 1/580-A8-08, 3/580-A8-01, and 2/581-A1-01, and refer to the concrete wall notch.
Challenge: Structural contract drawings 581-S4-02, 581-S4-03, and 581-S4-04 did not include reference dimensions for floor sleeves.
Solution: Pinnacle requested clarification from the client. They confirmed that pipe sleeves and mechanical blockouts in the slab were excluded from the project scope.
Pinnacle's Structural BIM Modeling Services helped identify and resolve constructability issues while developing concrete shop drawings. The team addressed discrepancies in angular dimensions, conflicting slab elevations, and missing reference dimensions by obtaining clarification from the client.
The effective application of BIM helped save time, eliminate rework, and improve the quality of the project deliverables.