Amazon Web Services (AWS) has opened the AWS Asia Pacific (Jakarta) Region, located in Jakarta, Indonesia. This region offers three Availability Zones (AZs) for customers to manage data both onshore and offshore with low latency.
The main data center utilizes a Nova Racking system with 288 data racks and 9 Air Handling Units (AHUs) within the 5,000 square meter Pontoon Building (Phase I). This LEED Platinum-rated facility ensures the highest standards of sustainability and energy efficiency.
• Validation of design models according to client specifications and construction requirements
• Coordination of all building elements and creation of clash reports
• LOD500 modeling of LLE (Long Lead Equipment) for subcontractor visualization and site coordination
• Preparation of builders work drawings for MEP penetration through floors and walls
• Creation of precast wall drawings for MEP penetrations
• Generation of Revit shop drawings for all trades
• Quantity take-off (BOQ) for MEP sub-contractors
Contractor(s):
Full Name* Email* Designation*
Download Project Detail
Project Detail will be sent over the provided Email address as well.
Overcoming Space Constraints for AHU Replacement in Chiller Yard
Chiller pipe supports and plinths were adjusted to create space for AHU replacement in the chiller yard.
Complex Service Coordination Due to Limited Ceiling Space
We proposed solutions for service relocation and re-sizing. This proactive approach enabled us to achieve optimal coordination within a compressed timeframe.
By optimizing pipe fitting selection, we reduced and brought down fittings from 284 to 201 in the final installation. This optimization resulted in an estimated cost saving of approximately $5,500.
Electrical pits were reduced by 198 in the final installation, further minimizing labor and material costs.