Location Charlotte, NC, USA

Year 2022

Key Project Details
share link

Project Area:1,168,970 sq ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:1,168,970 sq ft

Architect:NA

Engineer:WSP

Contractor(S):DPR Rodger

Owner:Atrium Health

Trades Covered:HVAC & Mechanical Piping

LOD:400

Software:Revit Fabrication 2023

Verticals:  HVAC & Mechanical Piping

atrium health charlotte nc

Atrium Health Facility is situated adjacent to uptown Charlotte on Blythe Road.It is a vast 12-story, 1.1 million square foot facility, set to cater to varied healthcare requirements, slated for inauguration in 2027. Seamlessly integrated with the Dickson Tower and the David L. Conlan Center at Atrium Health Carolinas Rehabilitation, the new bed tower will accommodate 448 patient rooms, 38 operating rooms, 16 procedure rooms, a pod-style emergency department, a fresh helipad, and more at full capacity.

Key Project Details

Project Area:1,168,970 sq ft

Architect:NA

Engineer:WSP

Contractor(s):DPR Rodger

Owner:Atrium Health

LOD:400

Trades Covered:HVAC & Mechanical Piping

Software:Revit Fabrication 2023

Verticals:  HVAC & Mechanical Piping

Scope of Work:

  • Sheet Metal 3D Model
  • HVAC Piping 3D Model
  • Clash Coordination with other trades
  • Shop Drawing
  • Hanger Drawing
  • Riser Drawing
  • MAJ/Fabrication Drawing
  • Equipment PAD Layout
  • Rack Spool Drawing

Challenges & Solutions:

Challenge 1:

Insufficient space hindered the completion of the duct network between the riser/shaft, AHU, and louver, as per the mechanical input drawing's AHU location.

Solution 1:

Pinnacle suggested swapping the AHU location to avoid any clashes and maintain a coordinated flow of elements seeking MSS Solutions’ approval.

Challenge 2:

The riser ducts encountered clashes with the structural beam within the building shaft.

Solution 2:

With our cutting-edge BIM coordination services we recommended clash-coordinated resizing of the source material, which MSS Solutions approved, and the accurately revised sized components solved the purpose.

Pinnacle’s Value Addition:

1. The mechanical input drawing for the Atrium Health Charlotte NC project depicted future AHU units with incomplete duct routing, potentially causing significant issues during duct installation later on. Pinnacle recommended creating a complete model to prevent any potential problems in the future.

2. Typically, louvers were included in ductwork models as general entities. However, Pinnacle meticulously interpreted the details of the louver drawings in the Atrium Health North Carolina project to enhance their visibility and importance.

3. As an expert 3D BIM modeling services provider, Pinnacle utilized the generic rack model received from MSS Solutions to create the specific rack models to perfectly go with the structural requirement.