Westside Water Treatment Building 580 & 581

Location Los Banos, California, USA

Year March, 2018 - July, 2018

Key Project Details
share link

Project Area:29,400 sq ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:29,400 sq ft

Architect:NA

Engineer:NA

Contractor(S):Peck & Hiller Company

Owner:NA

Trades Covered:Structural BIM Modeling

LOD:400

Software:Revit 2016

Verticals:  3D BIM Model Creation

Explore BIM Services
an axonometric model_rendering of westside water treatment plant
an architectural or structural_engineering floor plan blueprint

Structural BIM Modeling for Water Treatment Facilities

Pinnacle provided Structural BIM Modeling Services to develop detailed concrete shop drawings for the Westside Water Treatment Buildings 580 and 581 in Los Banos, California. The project involved creating 3D BIM models and preparing construction drawings for various structural concrete elements.

Structural BIM Modeling Scope for Buildings 580 & 581

Pinnacle’s scope included:

  • • 3D BIM Model Creation: Developed structural BIM models for Buildings 580 and 581.
  • • Reservoir Floor Drawings: Prepared wall and column layout plans.
  • • Level 1 to Level 4 and Penthouse Roof Drawings: Prepared slab soffit plans, slab plans, and wall and column layout plans.
  • • Staircase Drawings: Prepared slab soffit plans, slab plans, and concrete sections for Stairs 1 and 2.
  • • Wall Elevations: Prepared exterior and interior wall elevations.
  • • Concrete Sections: Developed concrete slab and wall sections.
  • • Wet Well Drawings: Prepared wet well wall drawings.
Key Project Details

Project Area:29,400 sq ft

Architect:NA

Engineer:NA

Contractor(s):Peck & Hiller Company

Owner:NA

LOD:400

Trades Covered:Structural BIM Modeling

Software:Revit 2016

Verticals:  3D BIM Model Creation

Explore BIM Services

Challenges in Concrete Shop Drawing Development

1. Angular Dimension Discrepancies

Challenge: Pinnacle initially followed the dimensions provided in drawing 581-S4-01, starting from the upper-left corner near grid intersection U-24. A discrepancy was identified in the angular dimensions.

Solution: Pinnacle requested that the client review and confirm the issue. They clarified that the corner angles were expressed in degrees and minutes rather than decimal degrees. Our team converted them into decimal degrees using the provided CAD files.

2. Conflicting Top-of-Slab Elevations

Challenge: Drawings 581-S4-03 and 580-L1-02 showed different top-of-slab elevations for the Level 2 slab of the Transmission Pump Station.

Solution: Pinnacle requested confirmation of the correct top-of-concrete elevations. The client instructed the team to follow the structural slab elevations, consider the topping slab details in drawings 1/580-A8-08, 3/580-A8-01, and 2/581-A1-01, and refer to the concrete wall notch.

3. Missing Floor Sleeve Reference Dimensions

Challenge: Structural contract drawings 581-S4-02, 581-S4-03, and 581-S4-04 did not include reference dimensions for floor sleeves.

Solution: Pinnacle requested clarification from the client. They confirmed that pipe sleeves and mechanical blockouts in the slab were excluded from the project scope.

Pinnacle's Value Addition Through Structural BIM Modeling

Pinnacle's Structural BIM Modeling Services helped identify and resolve constructability issues while developing concrete shop drawings. The team addressed discrepancies in angular dimensions, conflicting slab elevations, and missing reference dimensions by obtaining clarification from the client.

The effective application of BIM helped save time, eliminate rework, and improve the quality of the project deliverables.

View Next Project next-arrow

Scan-to-BIM for G30 Project Phases I & II: Boiler & Chiller Plant Room

We'd love to hear about your next project.