Eagle Landing

Location Happy Valley, Clackamas County, OR

Year 2021

Key Project Details
share link

Project Area:200,552 Sq. Ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:200,552 Sq. Ft

Architect:NA

Engineer:NA

Contractor(S):NA

Owner:NA

Trades Covered:Concrete

LOD:400

Software:Revit 2021

Verticals:  concrete contractors

The Eagle Landing project encompasses a total area of approximately 200,552 sq. ft. It is located in Happy Valley, Clackamas County, OR. The building consists of 4 stories and a roof level, with a mixed-use community landscape with ample parking space. The client primarily required our team to work on the concrete trades for up to level 2.

Key Project Details

Project Area:200,552 Sq. Ft

Architect:NA

Engineer:NA

Contractor(s):NA

Owner:NA

LOD:400

Trades Covered:Concrete

Software:Revit 2021

Verticals:  concrete contractors

Scope Of Work:

 

The Pinnacle team worked on:

 

  • Concrete 3D model 
  • Model Coordination
  • Shop Drawing/2D Drawing
  • Concrete quantity take-off

 

 

Challenges & Solutions:

 

Challenge 1:

 

During the planning phase, there were no embedded submittals which led to a lot of unsure assumptions. there was a risk of manpower crisis and potential misinformation on the estimation side as well.

 

Solution 1:

 

We raised 13 RFIs and 10 query parameters regarding the drawing mismatches, which assisted the client in evaluating and confirming all the areas in the drawings that required correction. This included deriving close assumptions and identifying the areas that required clarification on various critical points of structural application. With this, we were able to expedite the overall coordination process with regards to the rebar and steel structure of the project.

 

 

Pinnacle’s Value Addition:

 

  • We delivered the drawings ahead of the assigned time frame, providing the clients with ample time to review the drawings and note all necessary changes.
  • Additionally, we provided the concrete quantity take-off, which aided the clients in their estimating process.

 

 

Outcomes:

 

           1. Foundation plan drawing 

 

 

Foundation Plan Drawing

 

 

         2. Foundation section drawing 

 

 

 

Foundation Plan Drawing 2

 

 

 

        3. Isometric view of the model

 

 

 

Isometric view of the model

 

 

 

next-arrow Previous Project

Lake Lanier Olympic Park Boathouse Reconstruction

View Next Project next-arrow

San Mateo Wastewater Treatment Plant

We'd Love To Hear About Your Next Project.

Let's Talk