Location Clackamas County, OR, USA

Year September 2021 - December 2021

Key Project Details
share link

Project Area:200,552 Sq. Ft.

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:200,552 Sq. Ft.

Architect:NA

Engineer:4

Contractor(S):NA

Owner:NA

Trades Covered:Concrete

LOD:400

Software:Revit 2021

Verticals:  concrete contractors

Explore BIM Services
Happy Valley, Clackamas Country, OR
Isometric View of the Model
Foundation Section Drawing
Foundation Plan Drawing

3D Concrete Modeling Services Project Overview

The Eagle Landing project encompasses a total area of approximately 200,552 sq. ft. It is located in Happy Valley, Clackamas County, OR. The building consists of 4 stories and a roof level, with a mixed-use community landscape with ample parking space. The project demonstrates the application of BIM for mixed-use building projects in coordinating concrete requirements within a multi-level development. The client primarily required our team to work on the concrete trades for up to level 2.

Scope of BIM Services for Concrete Contractors

  • • Concrete 3D Model: Developed a detailed 3D concrete model to support accurate structural documentation and coordination.
  • • Model Coordination: Coordinated the concrete model with project requirements to identify and resolve potential design conflicts.
  • • Shop Drawing/2D Drawing: Prepared detailed shop drawings and 2D drawings to support accurate construction and installation activities.
  • • Concrete Quantity Take-Off: Provided accurate concrete quantity take-offs to support estimation, planning, and project cost management.
Key Project Details

Project Area:200,552 Sq. Ft.

Architect:NA

Engineer:4

Contractor(s):NA

Owner:NA

LOD:400

Trades Covered:Concrete

Software:Revit 2021

Verticals:  concrete contractors

Explore BIM Services

Challenges & Solutions of the Mixed-Use Project

Challenges: During the planning phase, there were no embedded submittals, which led to a lot of unsure assumptions. There was a risk of manpower crisis and potential misinformation on the estimation side as well.

Solution: We raised 13 RFIs and 10 query parameters regarding the drawing mismatches, which assisted the client in evaluating and confirming all the areas in the drawings that required correction. This included deriving close assumptions and identifying the areas that required clarification on various critical points of structural application. With this, we were able to expedite the overall coordination process with regard to the rebar and steel structure of the project.

Pinnacle's Value Addition

We delivered the drawings ahead of the assigned time frame, providing the clients with ample time to review the drawings and note all necessary changes.

Our 3D concrete modeling services supported the development of the concrete model and related construction documentation.

Additionally, we provided the concrete quantity take-off, which aided the clients in their estimating process.

Our approach also reflects the role of BIM services for concrete contractors in supporting coordination, drawing production, and bim estimation requirements.

 

Outcomes:

 

1. Foundation plan drawing 

 

Foundation Plan Drawing

 

2. Foundation section drawing

 

Foundation Section Drawing

 

3. Isometric view of the model

 

Isometric View of the Model

next-arrow Previous Project

Lake Lanier Olympic Park Boathouse Reconstruction

View Next Project next-arrow

San Mateo Wastewater Treatment Plant

We'd Love To Hear About Your Next Project.

Let's Talk