  • 3D Concrete Modeling Services for University of Arizona Institutional Building

3D Concrete Modeling - University of Arizona Institutional Building

Location Tucson, AZ, USA

Year June 2021 - April 2022

Key Project Details
share link

Project Area:100,000 sq. ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:100,000 sq. ft

Architect:SMITH GROUP

Engineer:NA

Contractor(S):McCarthy Building Companies, Inc.

Owner:NA

Trades Covered:Concrete

LOD:NA

Software:Rebar CAD 2021

Verticals:  Rebar/Reinforcement Contractors

Explore BIM Services
University of Arizona
Tower Crane Foundation Drawing
Slab & Beam Drawing
Sheer Wall Drawing
Column Drawing

3D Concrete Modeling Services Project Overview

The University of Arizona Applied Research Building is an educational building project with G+3 Floors construction benefiting from Concrete BIM services. Located in Tucson, Arizona, USA, the building project mainly required work to be done around BIM reinforcement detailing and bar bending schedule.

Scope of BIM Services for Concrete Contractors

Providing specialized BIM Services for Concrete Contractors, the work scope covered building elements of footing, foundation wall, SOG, column, floor beam, and PT slab. Our scope on 2D rebar shop drawings and BBS used Rebar CAD software version 2021, providing the foundational data necessary for a complete 3D Concrete model. Nearly 1,00,000 Sq. Ft. of area was included under the scope of work, utilizing workflows perfectly adaptable for advanced 3D Concrete modeling.

Key Project Details

Project Area:100,000 sq. ft

Architect:SMITH GROUP

Engineer:NA

Contractor(s):McCarthy Building Companies, Inc.

Owner:NA

LOD:NA

Trades Covered:Concrete

Software:Rebar CAD 2021

Verticals:  Rebar/Reinforcement Contractors

Explore BIM Services

Challenges & Solutions of the Institutional Building Project

Challenge: Multiple changes in work inputs impacted the planned submission schedule of the non-residential building project.

Solution: To resolve this, Pinnacle engaged a senior detailer to assess the changes, understand their impact, and incorporate updates into the final deliverables within the stipulated timeline.

Pinnacle's Value Addition

The team prepared the bar list in a fabrication-compatible format, enabling direct import into the fabrication unit without any additional conversion or processing.

Outcomes:

Slab and Beam Drawing

Slab & Beam Drawing

Column Drawing

Column Drawing

Tower Crane Foundation Drawing

Tower Crane Foundation Drawing

Sheer Wall Drawing

Sheer Wall Drawing

 

next-arrow Previous Project

Delgado School Of Nursing

View Next Project next-arrow

MEP BIM Modeling Services in Kentucky for UK Medical Center

We'd love to hear about your next project.

Let's Talk