A common challenge construction firms may experience when repairing footings of a 40-year old building, can be around removing the load-bearing wall to gain access to the footings while avoiding the risk of the whole structure settling down. It is during this situation that shoring becomes inevitable.
Shoring in construction is an engineering practice where crews provide temporary support to walls, foundations, trenches, and other structures. The shoring prevents collapse and enables workers to carry out their operations safely. Depending on the project requirements, contractors apply different shoring systems.
In addition, application of appropriate shoring systems not only enhances the safety of the construction site but also enables the efficient implementation of construction projects.
This article discusses shoring, its significance, types of systems, and the criteria engineers must meet when selecting them.
Shoring refers to temporary support used in the construction process to stabilize buildings, soil, or trenches. Contractors install shoring devices to transfer loads to the soil and prevent collapses.
For instance, crews install shoring before demolishing load-bearing walls. Also, in the excavation process, shoring acts to ensure that soil does not cave into an excavation pit.
In most cases, the project crew installs shoring using steel beams, wooden supports, hydraulic systems, or interlocking piles. These depend on the nature of shoring required in the process.
Nonetheless, shoring does not always play the same role. Sometimes teams use shoring in the stabilization of structures, while in other instances, shoring retains soil around excavations.
Key benefits of proper shoring:
Shoring is crucial when it comes to safety and structural soundness. Shifting loads, weak soils, and temporary structural openings often characterize active construction sites. All these factors without sufficient shoring lead to hazards.
Well-appointed shoring helps protect workers from trench collapses and structural failures. In addition, proper shoring prevents walls, floors, and foundations from collapsing while crews make repairs. An excavation support system minimizes the pressure of shifting soil and ground movement. This becomes even more relevant in cases where construction takes place next to other existing structures.
Apart from that, shoring enables construction firms to carry out their operations safely. Proper support systems also assist contractors to adhere to safety laws. But all this requires proper engineering, installation, inspection, and maintenance.
The shoring process involves different forms depending on the structure, type of soil, depth of excavation, and construction requirements. There are different benefits involved in different types of shoring systems.
In raking shoring, engineers incline the shores and call them rakers. The rakers bear the lateral loads from the wall to the ground.
The components used in raking shoring include inclined timbers or steel, wall plates, and proper connections. Contractors will fix the rakers at certain angles as recommended by engineers for them to function well.
The main purposes of raking shoring include stabilization of damaged or leaning walls. Crews use them to stabilize existing structures during renovations and to reinforce buildings before major repairs. Raking shores consume a lot of space on the ground. As such, one must consider issues of site access, among others, when using them.
In flying shoring, builders support two parallel walls without placing supports on the ground between them. Rather, horizontal elements and diagonal braces join the two opposing walls together.
This construction method involves the use of wall plates, struts, and braces. The design depends on wall conditions and the load the structure imposes.
This shoring method is ideal for construction where there is a need to do renovations to structures that have narrow spaces between walls. This construction method is also helpful in stabilizing adjacent walls when demolition and reconstruction take place. The method will allow access between the two structures.
However, the walls receiving support must bear the redirected load.
In dead shoring, vertical supports carry loads from floors, roofs, beams, and other structural components. Contractors widely use this shoring technique when repairing foundations or altering load-bearing walls.
Normally, dead shoring involves vertical members, supporting beams, and appropriate bearing plates. Through this system, workers can transfer loads directly to an established foundation or support footing.
The dead shoring technique is quite helpful in cases where contractors undertake the replacement of load-bearing walls, creation of openings, repair work on damaged foundations, and beam and column repairs.
While dead shoring supports vertical loads, unlike raking shoring that is designed to resist lateral loads, both lateral and vertical stability should be checked by engineers before implementation.
The method employs hydraulic pistons that press on the trench walls or other structures that require support. This method comprises such elements as hydraulic cylinders, adjustable struts, and steel or aluminum plates.
The installation and setting of hydraulic shoring do not take much time. In addition, using the equipment, people have an opportunity to set up support independently of wooden installations.
One can use the technique for supporting utility trenches, laying underground pipelines, and excavation of foundations. This shoring can be applied in stabilizing the soil while carrying out underground works.
The system is very helpful if the excavation crew needs adaptable support. However, one should strictly adhere to the manufacturer’s recommendations and check all the hydraulic components.
In this technique, there is a use of interconnected steel sheets or other manufactured sheet material to hold the soil in place. The sheets are driven or installed into the ground in order to create a continuous wall.
This wall will be able to withstand the lateral forces exerted by the soil. Depending on the type of system and the nature of soil, it may be able to control groundwater movement.
It is usually used in deep excavation work, basements, bridges and underground parking garages. It is especially applicable when the space available prevents the construction of excavation slopes.
However, the decision on whether to use this technique has to consider soil conditions, water table level, possibility of vibration, and foundations of other buildings, among other factors.
In soldier pile shoring, vertical steel piles are erected at equal distances. Workers place timber lagging or precast concrete panels between the piles to retain the soil.
In this process, engineers call the vertical steel beams “soldier piles.” In case of deep excavation and soil pressure, the wall will require anchors, braces, or internal struts.
Contractors install soldier pile walls in basement excavations and temporary trenches to provide lateral support. They assist in providing safety for adjacent structures and retaining soil in limited spaces for construction.
This method is quite flexible since engineers are free to design the distance of piles depending on the project. The contractor must assess soil performance and groundwater presence before starting work.
Also Read: Structural Design of Building: Step by Step Explained
Project: Renovation of downtown office building, which is 100 years old and needs restoration of its facade and interior improvements.
Challenge: There were two load-bearing walls that were parallel and just 12 feet apart; it was too small to fit raking shores.
Solution: Flying shoring was used, with struts and diagonal members between the two walls, enabling workers to work on the facade while the interior spaces remained accessible for renovation.
Result: Workers completed facade work safely; interior remained accessible. Timeline: 2 weeks design/installation, 8 weeks total project. Cost-effective solution because ground-floor space = premium downtown real estate.
Project: New basement excavation adjacent to an occupied office building only 15 feet away.
Challenge: Clayey soil with shallow water table and risk of settlement affecting the neighboring structure. Traditional raking shores would clutter the cramped site and interfere with adjacent-building protection.
Solution: 18-inch H-beam soldier piles at 6-foot spacing with timber lagging and tie-back anchors to prevent outward thrust and lateral movement.
Result: Tie-back anchors provided stability without ground-level bracing. No settlement detected in adjacent building. Lateral support maintained throughout excavation.
The selection of the correct shoring system needs proper structural engineering analysis. The type of soil, excavation depth, and groundwater level dictate the shoring system that would be selected by the engineers. The job of the engineers is to analyze the structural load, surcharge load, and impact on surrounding structures.
Other considerations that would determine the appropriate shoring system include site access, space availability, duration of the project, and equipment requirements. Contractors need to look at costs, maintenance, and system removal considerations. Ultimately, an engineer needs to perform the load evaluation and approve the system.
Shoring for construction serves an important purpose during excavation, renovation, and repairs. Project teams must choose the appropriate shoring method based on soil type and structural loads to maximize utility and performance. Proper planning, appropriate shoring equipment, and timely maintenance inspections are the key considerations for smooth process enablement and operations for projects involving shoring in construction.
Hydraulic system: 1–2 days. Soldier pile system/shield wall system: 5–14 days. Raking shoring system: 2–3 days. Special considerations such as soil testing will affect this.
Yes, you need it. The majority of municipalities demand a PE stamped shoring design plan. OSHA guidelines necessitate engineering documentation. Otherwise, penalties may follow.
OSHA 1926.652 (excavations safety), ANSI standards, local building codes and California Title 8 which has more stringent demands. Check your local authority.
Must Read
Geotechnical Engineering: Process, Applications, and Importance in Construction
Digital Design & BIM Engineering for Clients
Step-by-Step Excavation Checklist for SOE Permit Approval
Trend-leading BIM Services for Concrete Contractors
What is Industrial Construction? Challenges, Types, Processes, and Costs
We have received your submission and our team will contact you soon.
Table of Contents