3D Concrete Modeling Services for 601 N. Central

Location Phoenix, AZ, USA

Year July 2017 - Sept 2022

Key Project Details
share link

Project Area:1,375,589 sq. ft.

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:1,375,589 sq. ft.

Architect:bKL Architecture

Engineer:7

Contractor(S):Secon Electric

Owner:LG Group

Trades Covered:Concrete

LOD:400 & 500

Software:Revit, Navisworks, AutoCAD

Verticals:  Electrical 3D Modeling, Coordination, Shop drawing, As-Built Drawings

Explore BIM Services
601N-central
Issue Due to Actual Gear Size
Proposed Elcetrical Room Layout
Shop Drawing Sample
Shop Drawing Sample-1
Shop Drawing Sample-2
Solution
T-04 Room-snap From Plan Layout

3D Concrete Modeling Services Project Overview

The 601 North Central project is an unparalleled mixed-use development located at the heart of downtown Phoenix. Developed by LG Group, the 1,306,935 SF, 747-unit project hosts a wide range of indoor and outdoor amenity spaces, including two large amenity decks located on the 8th and 28th floors. The building’s podium contains liner residential units, a flagship commercial retail space, and parking for residents and retail.

For this complex development, Pinnacle delivered 3D concrete modeling services to support detailed coordination, construction documentation, and installation requirements. The project demonstrates how BIM for mixed-use building projects can improve coordination across complex structural and architectural requirements.

Scope of BIM Services for Concrete Contractors

  • • Developing a model from LOD 300 to LOD 500
  • Value Engineering & Validation
  • • BIM-Based Design Coordination and Resolution
  • • Shop Drawing Production
  • As-Built Drawings
  • • Concrete modeling for detailed construction and installation requirements
Key Project Details

Project Area:1,375,589 sq. ft.

Architect:bKL Architecture

Engineer:7

Contractor(s):Secon Electric

Owner:LG Group

LOD:400 & 500

Trades Covered:Concrete

Software:Revit, Navisworks, AutoCAD

Verticals:  Electrical 3D Modeling, Coordination, Shop drawing, As-Built Drawings

Explore BIM Services

Challenges & Solutions of the Mixed Use Building Project

Challenges -

  • Design Changes
  • Document Tracking
  • Tight Deadline & Site Requirement
  • Additional Scope & Cost

Solutions -

  • The design was still being determined during the modeling work, so we went through all the documents and highlighted the central design conflicts/missing information. This helped to plan the sequence of work.
  • There were multiple document releases due to design changes, so our team prepared a Document Tracking Excel to track the latest documents/missing ones and share the same information with the client.
  • The construction and the modeling coordination work were going parallel. So, to meet the construction schedule, we took multiple steps:
    • Constant communication with the client to share the work status and to learn about the priority.
    • Highlighted issues along with probable solutions to get a quick resolution.
    • Resource planning to meet any urgent requirement.
  • Due to design changes, many additional scopes came up in the later stage. Pinnacle kept track of each task and shared a detailed report with the client. Which helped the client to keep track of the additional cost.

Pinnacle's Value Addition

1. Verified clearances as per NEC standards and modified the panel arrangement to meet compliance requirements.

T-04 ROOMSNAP FROM PLAN LAYOUT

T-04 Room-snap From Plan Layout

PROPOSED ELECTRICAL ROOM LAYOUT

Proposed Elcetrical Room Layout

2. Checked the manufacturer submittal to identify issues that could arise at the site and provided suitable solutions.

ISSUE DUE TO ACTUAL GEAR SIZE

Issue Due to Actual Gear Size

SOLUTION

Solution

3. Pinnacle used RevitTM with BIM interoperability tools and in-house automation add-ins to generate unique IDs for all 220,000+ assets in the LOD 500 intelligent model.

Outcomes

  • More quality output with less effort using Revit.
  • Quality shop drawings for installation work.
  • Flawless collaboration among stakeholders, reduced errors, and improved building performance.
  • Met the construction schedule without failure.

Shop Drawing Sample-1

601-n-central-image-4

Shop Drawing Sample

Shop Drawing Sample-2

These capabilities demonstrate the value of specialized BIM services for concrete contractors in managing complex concrete modeling, coordination, documentation, and construction requirements.