  • Structural Engineering Services for Cargill, Inc. – Boiler Access Stair and Platform, Industrial Plant

Boiler Access Stair and Platform, Industrial Plant

Location Eddyville, Iowa, USA

Year Dec 2022 - Jan 2023

Key Project Details
share link

Project Area:1500 Sq Ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:1500 Sq Ft

Architect:NA

Engineer:4

Contractor(S):Cargill, Inc.

Owner:Winger Contracting Company

Trades Covered:Steel elements 3D Model, Bill of Material, 2D Assembly and Fabrication Drawings, Clash Coordination & Clash report

LOD:400

Software:Tekla 2020, Navisworks 2020 & Microsoft Excel

Verticals:  Engineering Firms

Explore BIM Services
Cargill, INC. Boiler Access Stair and Platform
Boiler - Images-01
Boiler - Images-02

Structural Engineering Services Project Overview

Cargill, Inc. Boiler Access Stair and Platform project involved the development of a structural steel platform spanning 1,500 sq. ft. in Eddyville, Iowa. The client provided steel fabrication specifications required for the platform erection. The project aimed to create an elevated access platform for the factory’s boiler equipment.

Scope of the Structural Engineering Services Project

  • • Created 3D BIM models and extracted quantities of structural elements.
  • • Prepared fabrication deliverables and identified potential construction issues.
  • • Provided IFC files for client review and approval.
  • • Delivered KSS and DXF files to support part drawings.
  • • Generated NC files for all structural plates, including connection, gusset, and base plates.
Key Project Details

Project Area:1500 Sq Ft

Architect:NA

Engineer:4

Contractor(s):Cargill, Inc.

Owner:Winger Contracting Company

LOD:400

Trades Covered:Steel elements 3D Model, Bill of Material, 2D Assembly and Fabrication Drawings, Clash Coordination & Clash report

Software:Tekla 2020, Navisworks 2020 & Microsoft Excel

Verticals:  Engineering Firms

Explore BIM Services

Challenges & Solutions of the Industrial Plant Project

Challenge: The structural documents provided only a generic gusset plate connection detail, which did not match the project-specific conditions. Multiple HSS braces connected to a single column required a customized gusset plate connection.

Solution: Pinnacle utilized the Tube Gusset component from Tekla Warehouse and configured the end offset values for the bolted connections to create the required gusset plate assemblies accurately.

Challenge: The stair modeling required accurate placement of treads, risers, and stringers. While following the provided stair details, it was identified that the horizontal length needed revision for proper placement.

Solution: Calculated the required stair extension length to position the stringer correctly. The proposed changes were accepted, and the structural engineering design was updated accordingly.

Pinnacle's Value Addition

  • Prepared structural shop drawings to support accurate assembly of steel elements on site.
  • Generated NC files compatible with CNC machines for direct fabrication of steel components for the structural engineering services project.
  • Provided a BOQ with accurate material quantities required for project execution.

Shop Drawing

Erection Drawings

Pinnacle's Output:

1. Concrete 3D Model

Concrete 3D Model

2. Beam Assembly BOQ:

Beam Assembly BOQ

3. Erection Drawings:

Erection Drawings

Erection Drawings

Erection Drawings

4. Connection Detail Drawings:

Connection Detail Drawings

5. Stringer Assembly Drawings:

Stringer Assembly Drawings

next-arrow Previous Project

Meadowbrook Housing

View Next Project next-arrow

Lake Lanier Olympic Park Boathouse Reconstruction

We'd Love To Hear About Your Next Project.

Let's Talk