Location 2222 N COLLEGE AVE.
Year February, 2025 - October, 2025
Project Area:38,717 sq ft
Architect:R3B Architecture
Engineer:NA
Contractor(S):NA
Owner:BPCP LLC, LLC
Trades Covered:Architecture
LOD:NA
Software:AutoCAD
Verticals: Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors
Citizenʼs Park Apartments is a modern G+2 residential project in Indianapolis, addressing the cityʼs growing need for well-planned urban housing. Positioned along a key residential corridor, it enhances the neighborhood while providing comfortable, efficient living spaces.
The 38,717 sq. ft. building features 34 thoughtfully designed dwelling units, along with shared amenities such as a community room, fitness room, and leasing office. Two staircases and a lift ensure accessibility and life-safety compliance. Solar panels on the roof level support energy efficiency and lower operational costs.
The project is backed by comprehensive architectural and BIM documentation, including address plans, detailed floor layouts, wall and floor assemblies, and isometric views for seamless coordination—reflecting a balanced approach to sustainable, functional, and community-oriented residential design.
Significant Aspects of the Project:
Our scope of work for the project included:
Review of client conceptual drawings, incorporating updated standards and revisions, assessing design feasibility, and aligning planning intent with functional requirements.
Development of architectural floor plans per client instructions, including amenity detailing, address plans, space planning coordination, and natural ventilation validation.
Architectural keynotes and tags placement; preparation of the wall and building sections; drafting slab edge, roof, stair, and elevator layouts; and developing door, window, and detail sheets with schedules.
Preparation of Life Safety Plans, verification of accessibility and code compliance, and coordination of life safety elements across drawings.
Sheet setup for plans and details, preparation of data sheets and appliance schedules, and quality control of architectural construction documents for accuracy and consistency.
Contractor(s):NA
Challenge: Specific working style and project standards
Solution: A project standard checklist makes it easier to double-verify everything. Workshops help new resources learn how to begin
Challenge: Working on CAD at 1/256 precision is challenging
Solution: Developing a dynamic block library reduces drafting errors in repetitive tasks. Using LISP in CAD helps identify sloppy or overlapping lines.
Challenge: Client-estimated and actual team hours
Solution: The breakdown of hours can be reviewed and discussed to ensure transparency. Any additional scope or time required to complete the task should also be discussed.
Challenge: Sudden design changes result in reworks and the team is unable to meet deadlines
Solution: Empower the team with flexible resources to manage design changes quickly and minimize delays. Discuss value engineering at the project kickoff. Proven team techniques and methods help ensure tasks are completed within deadlines.