Citizenʼs Park Apartments, Indianapolis, IN, USA

Location 2222 N COLLEGE AVE.

Year February, 2025 - October, 2025

Key Project Details
share link

Project Area:38,717 sq ft

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:38,717 sq ft

Architect:R3B Architecture

Engineer:NA

Contractor(S):NA

Owner:BPCP LLC, LLC

Trades Covered:Architecture

LOD:NA

Software:AutoCAD

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services
Citizenʼs Park Apartments, Indianapolis, IN, USA
Citizenʼs Park Apartments, Indianapolis, IN, USA

Citizenʼs Park Apartments is a modern G+2 residential project in Indianapolis, addressing the cityʼs growing need for well-planned urban housing. Positioned along a key residential corridor, it enhances the neighborhood while providing comfortable, efficient living spaces.

The 38,717 sq. ft. building features 34 thoughtfully designed dwelling units, along with shared amenities such as a community room, fitness room, and leasing office. Two staircases and a lift ensure accessibility and life-safety compliance. Solar panels on the roof level support energy efficiency and lower operational costs.

The project is backed by comprehensive architectural and BIM documentation, including address plans, detailed floor layouts, wall and floor assemblies, and isometric views for seamless coordination—reflecting a balanced approach to sustainable, functional, and community-oriented residential design.

Significant Aspects of the Project:

  1. 1. 85 solar panels, each measuring 8×4 feet.
  2. 2. Accessible circulation with lift and stairs.
  3. 3. Community-focused shared living amenities.

Scope of Work

Our scope of work for the project included:

1. Concept Review, Design Development & Feasibility

Review of client conceptual drawings, incorporating updated standards and revisions, assessing design feasibility, and aligning planning intent with functional requirements.

2. Architectural Planning & Layout Development

Development of architectural floor plans per client instructions, including amenity detailing, address plans, space planning coordination, and natural ventilation validation.

3. Detailed Architectural Drafting & Drawings

Architectural keynotes and tags placement; preparation of the wall and building sections; drafting slab edge, roof, stair, and elevator layouts; and developing door, window, and detail sheets with schedules.

4. Code Compliance, Life Safety & Accessibility

Preparation of Life Safety Plans, verification of accessibility and code compliance, and coordination of life safety elements across drawings.

5. Sheet Setup, Schedules & Construction Documentation

Sheet setup for plans and details, preparation of data sheets and appliance schedules, and quality control of architectural construction documents for accuracy and consistency.

Key Project Details

Project Area:38,717 sq ft

Architect:R3B Architecture

Engineer:NA

Contractor(s):NA

Owner:BPCP LLC, LLC

LOD:NA

Trades Covered:Architecture

Software:AutoCAD

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services

Challenges & Solutions:

Challenge: Specific working style and project standards

Solution: A project standard checklist makes it easier to double-verify everything. Workshops help new resources learn how to begin

Challenge: Working on CAD at 1/256 precision is challenging

Solution: Developing a dynamic block library reduces drafting errors in repetitive tasks. Using LISP in CAD helps identify sloppy or overlapping lines.

Challenge: Client-estimated and actual team hours

Solution: The breakdown of hours can be reviewed and discussed to ensure transparency. Any additional scope or time required to complete the task should also be discussed.

Challenge: Sudden design changes result in reworks and the team is unable to meet deadlines

Solution: Empower the team with flexible resources to manage design changes quickly and minimize delays. Discuss value engineering at the project kickoff. Proven team techniques and methods help ensure tasks are completed within deadlines.

Pinnacle's Value Addition:

  1. 1. A dynamic block library reduces drafting errors in repetitive tasks.
  2. 2. Rework and turnaround time are minimized by proactively managing design changes and enabling flexible team allocation.
  3. 3. PI-AutoCAD tools enable batch renaming, one-step viewport control, and quick property copying, significantly reducing manual layer management time.
next-arrow Previous Project

SPCA of Texas Alterations Lone Star

View Next Project next-arrow

Dawoodi Bohra Al Masjid Al Mohammedi Anjuman-e-Najmi Mosque

We'd love to hear about your next project.

Let's Talk