Evans West Development

Location Denver, Colorado, USA

Year 10 March 2022 - In progress

Key Project Details
share link

Project Area:412,130.00 sq. ft.

view Full Key Project Details
close arrow
Key Project Details
share link

Project Area:412,130.00 sq. ft.

Architect:

Engineer:4

Contractor(S):BIM for Drywall Contractors

Owner:360 Engineering Group, PLLC

Trades Covered:Architectural

LOD:400

Software:Autodesk Revit 2021

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services
Evans West Development

It’s a mixed-use type building consisting of 19 stories having an area of approximately 412,130 sq. ft. The building is located in Denver, Colorado, USA. The project Included Exterior Drywall Construction with metal studs as columns and framing. Also, 3D and 2D elevation drawings of panels with Quantity takeoff were included in the scope. The project required expertise in working on technology that offerscompetent solutions in Quantity Takeoff Services, 3D Modeling Services, and BIM for Drywall Contractors.

 

Key aspects of the project:

 

• The total estimated value of the project was $170 million

• Contains 420 units of apartments

• 1,317,000 linear feet of post-tension cable used

Scope Of Work:

 

• Exterior drywall Framing 3D model

• Layout plans 2D drawing

• Panel elevation 2D drawings

• Quantity take-offs of each panel

Key Project Details

Project Area:412,130.00 sq. ft.

Architect:

Engineer:4

Contractor(s):BIM for Drywall Contractors

Owner:360 Engineering Group, PLLC

LOD:400

Trades Covered:Architectural

Software:Autodesk Revit 2021

Verticals:  Structural Engineering, Concrete Contractors, Electric Contractors, General Contractors, Mechanical & Plumbing Contractors, Rebar / Reinforcement Contractors

Explore BIM Services

Challenges & Solutions:

 

Challenges 1: In the Evans West Development project there were multiple instances where we found out that the drywall fixes required to be changed.Over the course of the project, the design change occurred 3-4 times, due to which we had to revise both the modeling and the panel drawings.

 

Solution 1: We checked the metal framings and studs' clashes with other elements (slabs, windows, finishes, etc.) and assisted the client in performing the required design changes. In the process, we raised RFIs and communicated with the client through weekly review meetings. We took the client's suggestion before dealing with any coordination issues.

 

Challenges 2: The Evans West Denver project had a very tight timeline and delivery schedule. We were required to submit the 650-panel drawings along with the model in just a few weeks.

 

Solution 2: Our team finished all the submissions as per the client's timescale and milestones set for the project. We took the help of drawing tools and functional add-ins to perform the job more efficiently.

 

Pinnacle's Value Addition:

 

  • Time-optimization (Pre-construction of 650 panels in the fabrication industry).
  • Only field installation of panels was required
  • Reduced labor cost
  • Reduced material wastage
next-arrow Previous Project

Health Sciences Park Garage

View Next Project next-arrow

Microsoft PHX71 Data Center

We'd love to hear about your next project.

Let's Talk